If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0626053008000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.397584,"lon":-118.747505,"icon":""}]} |
| Location: 00/08-30-062-05W6/0 | |
| Location Alias: 00/08-30-62-05 W6M | |
| Location Alias 2: 00/08-30-062-05 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 30 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TOURMALINE ET AL HZ KAKWA 8-30-62-5 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0437746 | |
| License Date: 2011-10-18 | |
| License Status: Issued | |
| Spud Date: 2012-02-02 | |
| Final Drill Date: 2012-03-08 | |
| Well Total Depth: 4185.00 m | |
| Surface Hole Latitude: 54.397584 | |
| Surface Hole Longitude: -118.747505 |
| Date | Event |
|---|---|
| 2011-10-18 | Obtained License |
| 2012-02-07 | Surface Casing Operation Performed |
| 2012-02-15 | Intermediate Casing Operation Performed |
| 2012-02-19 | Well Log Performed |
| 2012-02-22 | Direction Drilling Operation Performed - Deviate |
| 2012-03-01 | Direction Drilling Operation Performed - Horizontal |
| 2012-03-02 | Well Log Performed |
| 2012-03-08 | Finished Drilling |
| 2012-03-08 | Well Mode changed to Drilled and Cased |
| 2012-03-18 | Production Casing Operation Performed |
| 2012-03-19 | Rig Released |
| 2012-07-28 | Well Log Performed |
| 2012-08-02 | Well Log Performed |
| 2012-08-13 | Well Log Performed |
| 2012-08-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-08-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-08-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-08-24 | Well Began Production |
| 2012-08-24 | Well Fluid changed to Gas |
| 2012-08-24 | Well Mode changed to Flowing |
| 2016-01-18 | Well Fluid changed to Gas |
| 2016-01-18 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-02-02 | Patterson-UTI Drilling Co. Canada | 15E | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-02-22 | 2677.00 | Deviate (5 - 79 degrees) |
| 2012-03-01 | 3121.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-08-21 | Multi-Stage Fracture | 4095.00 | 4095.10 | 0 |
| 2012-08-22 | Multi-Stage Fracture | 3468.00 | 3468.10 | 0 |
| 2012-08-22 | Multi-Stage Fracture | 3400.00 | 3400.10 | 0 |
| 2012-08-23 | Multi-Stage Fracture | 3332.00 | 3332.10 | 0 |
| 2012-08-23 | Multi-Stage Fracture | 3251.00 | 3251.10 | 0 |
| 2012-08-23 | Multi-Stage Fracture | 3196.00 | 3196.10 | 0 |
| 2012-08-23 | Multi-Stage Fracture | 3114.00 | 3114.10 | 0 |
| 2012-08-21 | Multi-Stage Fracture | 4026.00 | 4026.10 | 0 |
| 2012-08-21 | Multi-Stage Fracture | 3958.00 | 3958.10 | 0 |
| 2012-08-22 | Multi-Stage Fracture | 3890.00 | 3890.10 | 0 |
| 2012-08-22 | Multi-Stage Fracture | 3821.00 | 3821.10 | 0 |
| 2012-08-22 | Multi-Stage Fracture | 3740.00 | 3740.10 | 0 |
| 2012-08-22 | Multi-Stage Fracture | 3672.00 | 3672.10 | 0 |
| 2012-08-22 | Multi-Stage Fracture | 3604.00 | 3604.10 | 0 |
| 2012-08-22 | Multi-Stage Fracture | 3536.00 | 3536.10 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 2867 | 0.0 | 0.0 | 0.0 |
| 2013 | 7396 | 0.0 | 0.0 | 0.0 |
| 2014 | 6389 | 0.0 | 0.0 | 0.0 |
| 2015 | 8498 | 0.0 | 0.0 | 0.0 |
| 2016 | 8607 | 0.0 | 0.0 | 0.0 |
| 2017 | 7890 | 0.0 | 0.0 | 0.0 |
| 2018 | 8341 | 0.0 | 0.0 | 0.0 |
| 2019 | 8098 | 0.0 | 0.0 | 0.0 |
| 2020 | 2019 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-03-21 | No Incident Encountered | 0.00 | 0.00 |
| 2012-09-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]