If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0626061015000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.355102,"lon":-118.810383,"icon":""}]} |
| Location: 00/15-10-062-06W6/0 | |
| Location Alias: 00/15-10-62-06 W6M | |
| Location Alias 2: 00/15-10-062-06 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 10 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TOURMALINE ET AL KAKWA 15-10-62-6 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0416300 | |
| License Date: 2009-12-23 | |
| License Status: Issued | |
| Spud Date: 2010-01-09 | |
| Final Drill Date: 2010-02-03 | |
| Well Total Depth: 3354.00 m | |
| Surface Hole Latitude: 54.355102 | |
| Surface Hole Longitude: -118.810383 |
| Date | Event |
|---|---|
| 2009-12-23 | Obtained License |
| 2010-01-13 | Surface Casing Operation Performed |
| 2010-01-22 | Well Log Performed |
| 2010-01-23 | Intermediate Casing Operation Performed |
| 2010-02-03 | Finished Drilling |
| 2010-02-03 | Well Mode changed to Drilled and Cased |
| 2010-02-05 | Production Casing Operation Performed |
| 2010-02-07 | Rig Released |
| 2010-02-13 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-13 | Well Log Performed |
| 2010-02-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2010-02-16 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-16 | Well Log Performed |
| 2010-02-17 | Perforation Treatment Performed - Fractured |
| 2010-02-18 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-18 | Well Log Performed |
| 2010-02-19 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-21 | Perforation Treatment Performed - Fractured |
| 2010-02-22 | Perforation Treatment Performed - Fractured |
| 2010-02-22 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-22 | Well Log Performed |
| 2010-02-23 | Well Log Performed |
| 2010-02-24 | Perforation Treatment Performed - Fractured |
| 2010-02-24 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-24 | Well Log Performed |
| 2010-04-01 | Well Began Production |
| 2010-04-01 | Well Fluid changed to Gas |
| 2010-04-01 | Well Mode changed to Flowing |
| 2016-04-01 | Well Fluid changed to Gas |
| 2016-04-01 | Well Mode changed to Pumping |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-02-13 | Perforation | 3326.00 | 3327.00 | 36 |
| 2010-02-19 | Perforation | 3112.50 | 3112.70 | 3 |
| 2010-02-21 | Fracture | 3112.50 | 3228.70 | 0 |
| 2010-02-22 | Perforation | 2985.00 | 2985.30 | 6 |
| 2010-02-22 | Perforation | 2960.50 | 2960.80 | 6 |
| 2010-02-22 | Perforation | 2959.00 | 2959.30 | 6 |
| 2010-02-22 | Fracture | 2959.00 | 2960.80 | 0 |
| 2010-02-24 | Perforation | 2859.00 | 2859.50 | 6 |
| 2010-02-24 | Perforation | 2678.00 | 2678.50 | 6 |
| 2010-02-24 | Perforation | 2633.50 | 2634.00 | 6 |
| 2010-02-24 | Perforation | 2591.50 | 2592.00 | 6 |
| 2010-02-15 | Acid Treatment | 3326.00 | 3327.00 | 0 |
| 2010-02-24 | Perforation | 2547.00 | 2547.50 | 6 |
| 2010-02-24 | Fracture | 2547.00 | 2859.50 | 0 |
| 2010-02-16 | Perforation | 3318.00 | 3319.00 | 18 |
| 2010-02-17 | Fracture | 3318.00 | 3327.00 | 0 |
| 2010-02-18 | Perforation | 3228.50 | 3228.70 | 3 |
| 2010-02-18 | Perforation | 3216.00 | 3216.20 | 3 |
| 2010-02-18 | Perforation | 3206.00 | 3206.20 | 6 |
| 2010-02-19 | Perforation | 3131.00 | 3131.30 | 3 |
| 2010-02-19 | Perforation | 3122.00 | 3122.20 | 3 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 5010 | 0.0 | 0.0 | 0.0 |
| 2011 | 7831 | 0.0 | 0.0 | 0.0 |
| 2012 | 7188 | 0.0 | 0.0 | 0.0 |
| 2013 | 4600 | 0.0 | 0.0 | 0.0 |
| 2014 | 4840 | 0.0 | 0.0 | 0.0 |
| 2015 | 7640 | 0.0 | 0.0 | 0.0 |
| 2016 | 6358 | 0.0 | 0.0 | 0.0 |
| 2017 | 6416 | 0.0 | 0.0 | 0.0 |
| 2018 | 7480 | 0.0 | 0.0 | 0.0 |
| 2019 | 6790 | 0.0 | 0.0 | 0.0 |
| 2020 | 1884 | 0.0 | 0.0 | 0.0 |
For data sources see[5]