X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626061316020

Well Details

Well ID: 0626061316020
Loading map...
Location: 02/16-13-062-06W6/0
Location Alias: 02/16-13-62-06 W6M
Location Alias 2: 02/16-13-062-06 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 06
Section: 13
County/Municipality: Municipal District of Greenview No. 16
Well Name: XTO 102 HZ KAKWA 16-13-62-6
Operator Name: XTO Energy Canada ULC
License Number: 0473684
License Date: 2014-12-19
License Status: Amended
Spud Date: 2015-02-23
Final Drill Date: 2015-07-12
Well Total Depth: 5123.00 m
Surface Hole Latitude: 54.356633
Surface Hole Longitude: -118.745644

For data sources see[1][2]

Well History

Date Event
2014-12-19 Obtained License
2015-02-27 Surface Casing Operation Performed
2015-05-14 Direction Drilling Operation Performed - Deviate
2015-05-18 Intermediate Casing Operation Performed
2015-06-11 Direction Drilling Operation Performed - Horizontal
2015-06-16 Well Log Performed
2015-07-12 Finished Drilling
2015-07-12 Well Log Performed
2015-07-13 Well Mode changed to Drilled and Cased
2015-07-15 Production Casing Operation Performed
2015-07-15 Rig Released
2015-08-24 Perforation Treatment Performed - Jet Perforation
2015-08-25 Perforation Treatment Performed - Fractured
2015-08-26 Perforation Treatment Performed - Fractured
2015-08-26 Perforation Treatment Performed - Jet Perforation
2015-08-27 Perforation Treatment Performed - Fractured
2015-08-27 Perforation Treatment Performed - Jet Perforation
2015-08-28 Perforation Treatment Performed - Fractured
2015-08-28 Perforation Treatment Performed - Jet Perforation
2015-08-29 Perforation Treatment Performed - Fractured
2015-08-29 Perforation Treatment Performed - Jet Perforation
2015-09-01 Well Fluid changed to Gas
2015-09-01 Well Mode changed to Testing
2015-12-31 Well Fluid changed to Gas
2015-12-31 Well Mode changed to Test Completed
2016-01-01 Well Began Production
2016-01-01 Well Fluid changed to Gas
2016-01-01 Well Mode changed to Flowing
2019-08-01 Well Fluid changed to Gas
2019-08-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-05-08 Jomax Drilling (1988) Limited 3 N/A Resumption
2015-02-23 Jomax Drilling (1988) Limited 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-05-14 2298.40 Deviate (5 - 79 degrees)
2015-06-11 3872.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-08-24 Perforation 5088.50 5089.00 20
2015-08-26 Perforation 4935.00 4935.50 20
2015-08-26 Fracture 4935.00 5011.50 0
2015-08-26 Perforation 4914.50 4915.00 20
2015-08-26 Perforation 4895.50 4896.00 20
2015-08-26 Perforation 4876.50 4877.00 20
2015-08-26 Perforation 4857.50 4858.00 20
2015-08-26 Perforation 4838.50 4839.00 20
2015-08-26 Fracture 4838.50 4915.00 0
2015-08-26 Perforation 4818.00 4818.50 20
2015-08-26 Perforation 4799.00 4799.50 20
2015-08-24 Perforation 5069.50 5070.00 20
2015-08-26 Perforation 4780.00 4780.50 20
2015-08-26 Perforation 4761.00 4761.50 20
2015-08-26 Perforation 4742.00 4742.50 20
2015-08-26 Fracture 4742.00 4818.50 0
2015-08-27 Perforation 4721.50 4722.00 20
2015-08-27 Perforation 4702.50 4703.00 20
2015-08-27 Perforation 4683.50 4684.00 20
2015-08-27 Perforation 4664.50 4665.00 20
2015-08-27 Perforation 4645.50 4646.00 20
2015-08-27 Fracture 4645.50 4722.00 0
2015-08-24 Perforation 5050.50 5051.00 20
2015-08-27 Perforation 4625.00 4625.50 20
2015-08-27 Perforation 4606.00 4606.50 20
2015-08-27 Perforation 4587.00 4587.50 20
2015-08-27 Perforation 4568.00 4568.50 20
2015-08-27 Perforation 4549.00 4549.50 20
2015-08-27 Fracture 4549.00 4625.50 0
2015-08-27 Perforation 4528.50 4529.00 20
2015-08-27 Perforation 4509.50 4510.00 20
2015-08-27 Perforation 4490.50 4491.00 20
2015-08-27 Perforation 4471.70 4472.00 20
2015-08-24 Perforation 5031.50 5032.00 20
2015-08-27 Perforation 4452.50 4453.00 20
2015-08-27 Fracture 4452.50 4529.00 0
2015-08-27 Perforation 4432.00 4432.50 20
2015-08-27 Perforation 4413.00 4413.50 20
2015-08-27 Perforation 4394.00 4394.50 20
2015-08-27 Perforation 4375.00 4375.50 20
2015-08-27 Perforation 4356.00 4356.50 20
2015-08-28 Fracture 4356.00 4432.50 0
2015-08-28 Perforation 4335.50 4336.00 20
2015-08-28 Perforation 4316.50 4317.00 20
2015-08-25 Fracture 5031.50 5089.00 0
2015-08-28 Perforation 4297.50 4298.00 20
2015-08-28 Perforation 4278.50 4279.00 20
2015-08-28 Perforation 4259.50 4260.00 20
2015-08-28 Fracture 4259.50 4336.00 0
2015-08-28 Perforation 4238.50 4239.50 20
2015-08-28 Perforation 4200.50 4201.50 20
2015-08-28 Perforation 4162.50 4163.50 20
2015-08-28 Fracture 4162.50 4239.50 0
2015-08-28 Perforation 4142.50 4143.50 20
2015-08-28 Perforation 4104.50 4105.50 20
2015-08-26 Perforation 5011.00 5011.50 20
2015-08-28 Perforation 4066.50 4067.50 20
2015-08-28 Fracture 4066.50 4143.50 0
2015-08-29 Perforation 4046.00 4047.00 20
2015-08-29 Perforation 4008.00 4009.00 20
2015-08-29 Perforation 3970.00 3971.00 20
2015-08-29 Fracture 3970.00 4047.00 0
2015-08-29 Perforation 3949.50 3950.50 20
2015-08-29 Perforation 3911.50 3912.50 20
2015-08-29 Perforation 3873.50 3874.50 20
2015-08-29 Fracture 3873.50 3950.50 0
2015-08-26 Perforation 4992.00 4992.50 20
2015-08-26 Perforation 4973.00 4973.50 20
2015-08-26 Perforation 4954.00 4954.50 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-25 2015-08-29 3,653 17,117 N/A
2 2015-08-25 2015-08-27 3,653 0 N/A
3 2015-08-27 2015-08-29 3,653 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 89.5336 N/A
Atlas CRC-C (30/50) Canyon Crystalline silica. quartz 14808-60-7 100 0.9312 N/A
Hexamethylenetetramine 100-97-0 100 0.9312 N/A
Phenol formaldehyde resin 9003-35-4 100 0.9312 N/A
Sand (40/70) Ottawa Canyon Aluminum Oxide 1344-28-1 100 8.5989 N/A
Crystalline silica. quartz 14808-60-7 100 8.5989 N/A
Iron Oxide 1309-37-1 100 8.5989 N/A
Titanium Oxide 13463-67-7 100 8.5988 N/A
Sand (50/140) Canyon Aluminum Oxide 1344-28-1 100 0.3414 N/A
Crystalline silica. quartz 14808-60-7 100 0.3414 N/A
Iron Oxide 1309-37-1 100 0.3414 N/A
Titanium Oxide 13463-67-7 100 0.3414 N/A
HCL 15% Canyon Acid Hydrogen Chloride 7647-01-0 100 0.469 N/A
Water 7732-18-5 100 0.469 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0124 N/A
Water 7732-18-5 100 0.0124 N/A
CAN-1004 Corrosion Inhibitor Canyon Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0016 N/A
Alcohols. C14-15. ethoxylated 68951-67-7 100 0.0016 N/A
Formic Acid 64-18-6 100 0.0016 N/A
Isopropanol 67-63-0 100 0.0016 N/A
Methanol 67-56-1 100 0.0016 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0016 N/A
CAN-1203 Anti-Sludge Agent / Non-Emulsifier Canyon Demulsifier Refer to MSDS 8253 100 0.0008 N/A
CAN-1101 Iron Control Reduction Canyon Iron Control 2-Mercaptoethanol 60-24-2 100 0.0032 N/A
Cupric Chloride 7447-39-4 100 0.0032 N/A
Monoethanolamine 141-43-5 100 0.0032 N/A
CAN-1202 Acid Wetting Agent Canyon Surfactant 1-Methoxy-2-Propanol 107-98-2 100 0.001 N/A
Water 7732-18-5 100 0.001 N/A
2 CAN-2057 Friction Reducer Canyon Gelling Agent No hazardous ingredients Not Available 100 0.0642 N/A
3 CAN-2058 Friction Reducer Canyon Gelling Agent No hazardous ingredients Not Available 100 0.1034 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-08-27 2015-08-28 Surface Water - Runoff 649
2015-08-23 2015-08-27 Surface Water - Runoff 2239
2015-08-15 2015-08-23 Surface Water - Runoff 9584
2015-08-13 2015-08-15 Oilfield Produced Water 4895

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 720 0.0 0.0 0.0
2016 8658 0.0 0.0 0.0
2017 7989 0.0 0.0 0.0
2018 4081 0.0 0.0 0.0
2019 5780 0.0 0.0 0.0
2020 1922 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-15 No Incident Encountered 0.00 0.00
2015-09-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References