X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626061803002

Well Details

Well ID: 0626061803002
Loading map...
Location: 00/03-18-062-06W6/2
Location Alias: 00/03-18-62-06 W6M
Location Alias 2: 00/03-18-062-06 W6/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 06
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA KAKWA 3-18-62-6
Operator Name: Jupiter Resources Inc.
License Number: 0429431
License Date: 2011-01-06
License Status: Amended
Spud Date: 2011-07-21
Final Drill Date: 2011-09-08
Well Total Depth: 5783.00 m
Surface Hole Latitude: 54.343460
Surface Hole Longitude: -118.859810

For data sources see[1][2]

Well History

Date Event
2011-01-06 Obtained License
2011-07-24 Surface Casing Operation Performed
2011-08-04 Intermediate Casing Operation Performed
2011-08-13 Direction Drilling Operation Performed - Horizontal
2011-08-18 Direction Drilling Operation Performed - Horizontal
2011-09-08 Finished Drilling
2011-09-08 Well Mode changed to Drilled and Cased
2011-09-13 Production Casing Operation Performed
2011-09-15 Rig Released
2011-10-01 Well Log Performed
2011-11-02 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-11-02 Perforation Treatment Performed - Fractured
2011-11-03 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-11-03 Perforation Treatment Performed - Fractured
2011-11-04 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-11-04 Perforation Treatment Performed - Fractured
2011-11-05 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-11-05 Perforation Treatment Performed - Fractured
2011-11-06 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-11-06 Perforation Treatment Performed - Fractured
2011-11-11 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-11-11 Perforation Treatment Performed - Fractured
2011-11-12 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-11-12 Perforation Treatment Performed - Fractured
2011-11-21 Well Fluid changed to Gas
2011-11-21 Well Mode changed to Testing
2011-11-27 Well Began Production
2011-11-27 Well Fluid changed to Gas
2011-11-27 Well Mode changed to Flowing
2014-10-01 Well Fluid changed to Gas
2014-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-13 3301.70 Horizontal
2011-08-18 4007.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-02 Hydra Jet Perforation 5748.00 5748.10 0
2011-11-03 Fracture 5316.00 5316.10 0
2011-11-03 Hydra Jet Perforation 5208.00 5208.10 0
2011-11-03 Fracture 5208.00 5208.10 0
2011-11-03 Hydra Jet Perforation 5100.00 5100.10 0
2011-11-03 Fracture 5100.00 5100.10 0
2011-11-04 Hydra Jet Perforation 4992.00 4992.10 0
2011-11-04 Fracture 4992.00 4992.10 0
2011-11-04 Hydra Jet Perforation 4884.00 4884.10 0
2011-11-04 Fracture 4884.00 4884.10 0
2011-11-04 Hydra Jet Perforation 4776.00 4776.10 0
2011-11-02 Fracture 5748.00 5748.10 0
2011-11-04 Fracture 4776.00 4776.10 0
2011-11-04 Hydra Jet Perforation 4668.00 4668.10 0
2011-11-04 Fracture 4668.00 4668.10 0
2011-11-04 Hydra Jet Perforation 4560.00 4560.10 0
2011-11-04 Hydra Jet Perforation 4550.00 4550.10 0
2011-11-04 Fracture 4550.00 4550.10 0
2011-11-05 Hydra Jet Perforation 4460.00 4460.10 0
2011-11-05 Fracture 4460.00 4460.10 0
2011-11-05 Hydra Jet Perforation 4320.00 4320.10 0
2011-11-05 Hydra Jet Perforation 4313.00 4313.10 0
2011-11-02 Hydra Jet Perforation 5640.00 5640.10 0
2011-11-05 Fracture 4313.00 4313.10 0
2011-11-05 Hydra Jet Perforation 4219.00 4219.10 0
2011-11-05 Fracture 4219.00 4219.10 0
2011-11-05 Hydra Jet Perforation 4113.00 4113.10 0
2011-11-05 Hydra Jet Perforation 4103.00 4103.10 0
2011-11-06 Hydra Jet Perforation 4010.00 4010.10 0
2011-11-06 Fracture 4010.00 4010.10 0
2011-11-06 Hydra Jet Perforation 3803.00 3803.10 0
2011-11-06 Fracture 3803.00 3803.10 0
2011-11-11 Hydra Jet Perforation 3699.00 3699.10 0
2011-11-02 Fracture 5640.00 5640.10 0
2011-11-11 Fracture 3699.00 3699.10 0
2011-11-11 Hydra Jet Perforation 3596.00 3596.10 0
2011-11-11 Fracture 3596.00 3596.10 0
2011-11-11 Hydra Jet Perforation 3492.00 3492.10 0
2011-11-11 Fracture 3492.00 3492.10 0
2011-11-12 Hydra Jet Perforation 3389.00 3389.10 0
2011-11-12 Fracture 3389.00 3389.10 0
2011-11-12 Hydra Jet Perforation 3285.00 3285.10 0
2011-11-12 Fracture 3285.00 3285.10 0
2011-11-02 Hydra Jet Perforation 5532.00 5532.10 0
2011-11-02 Fracture 5532.00 5532.10 0
2011-11-03 Hydra Jet Perforation 5424.00 5424.10 0
2011-11-03 Fracture 5424.00 5424.10 0
2011-11-03 Hydra Jet Perforation 5316.00 5316.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 472 0.0 0.0 0.0
2012 6083 0.0 0.0 0.0
2013 5887 0.0 0.0 0.0
2014 8256 0.0 0.0 0.0
2015 8639 0.0 0.0 0.0
2016 8543 0.0 0.0 0.0
2017 6335 0.0 0.0 0.0
2018 7696 0.0 0.0 0.0
2019 8554 0.0 0.0 0.0
2020 2136 0.0 0.0 0.0

For data sources see[6]

References