X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626062513000

Well Details

Well ID: 0626062513000
Loading map...
Location: 00/13-25-062-06W6/0
Location Alias: 00/13-25-62-06 W6M
Location Alias 2: 00/13-25-062-06 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 06
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ KAKWA 13-25-62-6
Operator Name: Tourmaline Oil Corp.
License Number: 0437319
License Date: 2011-09-30
License Status: Issued
Spud Date: 2011-10-06
Final Drill Date: 2011-11-16
Well Total Depth: 4223.00 m
Surface Hole Latitude: 54.388922
Surface Hole Longitude: -118.768140

For data sources see[1][2]

Well History

Date Event
2011-09-30 Obtained License
2011-10-08 Surface Casing Operation Performed
2011-10-20 Intermediate Casing Operation Performed
2011-10-24 Direction Drilling Operation Performed - Deviate
2011-11-09 Direction Drilling Operation Performed - Horizontal
2011-11-11 Well Log Performed
2011-11-16 Finished Drilling
2011-11-16 Well Mode changed to Drilled and Cased
2011-11-19 Production Casing Operation Performed
2011-11-20 Rig Released
2011-12-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-09 Well Began Production
2011-12-09 Well Fluid changed to Gas
2011-12-09 Well Mode changed to Flowing
2019-04-06 Well Fluid changed to Gas
2019-04-06 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-24 2168.10 Deviate (5 - 79 degrees)
2011-11-09 3195.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-07 Multi-Stage Fracture 3990.00 3991.00 0
2011-12-08 Multi-Stage Fracture 3376.00 3377.00 0
2011-12-08 Multi-Stage Fracture 3296.00 3297.00 0
2011-12-08 Multi-Stage Fracture 3215.00 3216.00 0
2011-12-08 Multi-Stage Fracture 3134.00 3135.00 0
2011-12-08 Multi-Stage Fracture 3079.00 3080.00 0
2011-12-07 Multi-Stage Fracture 3934.00 3935.00 0
2011-12-07 Multi-Stage Fracture 3866.00 3867.00 0
2011-12-07 Multi-Stage Fracture 3798.00 3799.00 0
2011-12-07 Multi-Stage Fracture 3730.00 3731.00 0
2011-12-08 Multi-Stage Fracture 3649.00 3650.00 0
2011-12-08 Multi-Stage Fracture 3581.00 3582.00 0
2011-12-08 Multi-Stage Fracture 3512.00 3513.00 0
2011-12-08 Multi-Stage Fracture 3444.00 3445.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 255 0.0 0.0 0.0
2012 7539 0.0 0.0 0.0
2013 8483 0.0 0.0 0.0
2014 7940 0.0 0.0 0.0
2015 8347 0.0 0.0 0.0
2016 8548 0.0 0.0 0.0
2017 8753 0.0 0.0 0.0
2018 8449 0.0 0.0 0.0
2019 8274 0.0 0.0 0.0
2020 2152 0.0 0.0 0.0

For data sources see[6]

References