If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0626062705000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.368531,"lon":-118.818393,"icon":""}]} |
| Location: 00/05-27-062-06W6/0 | |
| Location Alias: 00/05-27-62-06 W6M | |
| Location Alias 2: 00/05-27-062-06 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 27 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: HARVEST KAKWA 5-27-62-6 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0450008 | |
| License Date: 2012-11-13 | |
| License Status: Amended | |
| Spud Date: 2012-12-09 | |
| Final Drill Date: 2013-01-19 | |
| Well Total Depth: 5290.00 m | |
| Surface Hole Latitude: 54.368531 | |
| Surface Hole Longitude: -118.818393 |
| Date | Event |
|---|---|
| 2012-11-13 | Obtained License |
| 2012-12-09 | Lost Circulation Occurred |
| 2012-12-12 | Lost Circulation Occurred |
| 2012-12-12 | Surface Casing Operation Performed |
| 2012-12-16 | Lost Circulation Occurred |
| 2012-12-17 | Well Log Performed |
| 2012-12-18 | Perforation Treatment Performed - Jet Perforation |
| 2012-12-18 | Perforation Treatment Performed - Remedial Casing |
| 2012-12-21 | Intermediate Casing Operation Performed |
| 2012-12-21 | Lost Circulation Occurred |
| 2012-12-31 | Direction Drilling Operation Performed - Deviate |
| 2013-01-06 | Direction Drilling Operation Performed - Horizontal |
| 2013-01-07 | Lost Circulation Occurred |
| 2013-01-07 | Well Log Performed |
| 2013-01-19 | Finished Drilling |
| 2013-01-19 | Well Log Performed |
| 2013-01-19 | Well Mode changed to Drilled and Cased |
| 2013-01-22 | Perforation Treatment Performed - Open-Hole Completion |
| 2013-01-22 | Production Casing Operation Performed |
| 2013-01-23 | Well Log Performed |
| 2013-01-24 | Rig Released |
| 2013-02-11 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-02-12 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-02-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-03-10 | Well Began Production |
| 2013-03-10 | Well Fluid changed to Gas |
| 2013-03-10 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-12-31 | 2761.40 | Deviate (5 - 79 degrees) |
| 2013-01-06 | 3277.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-12-18 | Perforation | 299.00 | 299.50 | 10 |
| 2013-02-11 | Multi-Stage Fracture | 4864.80 | 4865.30 | 0 |
| 2013-02-11 | Multi-Stage Fracture | 4789.30 | 4789.80 | 0 |
| 2013-02-11 | Multi-Stage Fracture | 4713.70 | 4714.00 | 0 |
| 2013-02-11 | Multi-Stage Fracture | 4638.50 | 4639.00 | 0 |
| 2013-02-12 | Multi-Stage Fracture | 4563.50 | 4564.00 | 0 |
| 2013-02-12 | Multi-Stage Fracture | 4488.70 | 4489.20 | 0 |
| 2013-02-12 | Multi-Stage Fracture | 4413.60 | 4414.10 | 0 |
| 2013-02-12 | Multi-Stage Fracture | 4337.90 | 4338.40 | 0 |
| 2013-02-12 | Multi-Stage Fracture | 4262.90 | 4263.40 | 0 |
| 2013-02-12 | Multi-Stage Fracture | 4188.10 | 4188.60 | 0 |
| 2012-12-18 | Perforation | 80.00 | 80.50 | 10 |
| 2013-02-12 | Multi-Stage Fracture | 4113.10 | 4113.60 | 0 |
| 2013-02-12 | Multi-Stage Fracture | 4038.30 | 4038.80 | 0 |
| 2013-02-12 | Multi-Stage Fracture | 3977.20 | 3977.70 | 0 |
| 2013-02-13 | Multi-Stage Fracture | 3887.90 | 3888.40 | 0 |
| 2013-02-13 | Multi-Stage Fracture | 3825.60 | 3826.10 | 0 |
| 2013-02-13 | Multi-Stage Fracture | 3750.10 | 3750.60 | 0 |
| 2013-02-13 | Multi-Stage Fracture | 3673.80 | 3674.30 | 0 |
| 2013-02-13 | Multi-Stage Fracture | 3598.60 | 3599.10 | 0 |
| 2013-02-13 | Multi-Stage Fracture | 3523.20 | 3523.70 | 0 |
| 2013-02-13 | Multi-Stage Fracture | 3448.70 | 3449.20 | 0 |
| 2012-12-18 | Remedial Casing Cementing | 80.00 | 299.50 | 0 |
| 2013-01-22 | Open Hole/Barefoot Completion | 5264.00 | 5290.00 | 0 |
| 2013-02-11 | Multi-Stage Fracture | 5240.30 | 5241.30 | 0 |
| 2013-02-11 | Multi-Stage Fracture | 5165.70 | 5166.20 | 0 |
| 2013-02-11 | Multi-Stage Fracture | 5090.00 | 5090.50 | 0 |
| 2013-02-11 | Multi-Stage Fracture | 5014.20 | 5014.70 | 0 |
| 2013-02-11 | Multi-Stage Fracture | 4939.90 | 4940.40 | 0 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-02-11 | 2013-02-13 | 3,109 | 3,603 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 69.5856 | N/A | |||
| 30/50 Prime Plus | Calfrac | Quartz | 14808-60-7 | 100 | 2.4114 | N/A | ||
| 30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 21.1342 | N/A | ||
| 50/140 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 0.4869 | N/A | ||
| Tolcide PS75LT | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0182 | N/A | |
| Water | 7732-18-5 | 100 | 0.0188 | N/A | ||||
| DWP-975 | Calfrac | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0211 | N/A | |
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0216 | N/A | ||||
| DWP-107 | Calfrac | Buffer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0827 | N/A | |
| Organic acid | 8454 | 100 | 0.0827 | N/A | ||||
| DWP-213 | Calfrac | Buffer | Inorganic base | 8296 | 100 | 0.2416 | N/A | |
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.2384 | N/A | ||||
| DWP-123 | Calfrac | Crosslinker | Borate salt | 8293 | 100 | 0.2742 | N/A | |
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.2743 | N/A | ||||
| Potassium hydroxide (K(OH)) | 1310-58-3 | 100 | 0.276 | N/A | ||||
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 5.3672 | N/A | |
| DWP-101 | Calfrac | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.4775 | N/A | |
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.4777 | N/A |
For data sources see[6]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-02-04 | 2013-02-20 | Surface Water - River | 3917 |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 6192 | 0.0 | 0.0 | 0.0 |
| 2014 | 6223 | 0.0 | 0.0 | 0.0 |
| 2015 | 8519 | 0.0 | 0.0 | 0.0 |
| 2016 | 8209 | 0.0 | 0.0 | 0.0 |
| 2017 | 8005 | 0.0 | 0.0 | 0.0 |
| 2018 | 8630 | 0.0 | 0.0 | 0.0 |
| 2019 | 8578 | 0.0 | 0.0 | 0.0 |
| 2020 | 2089 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-12-09 | Lost Circulation | 50.00 | 183.00 |
| 2012-12-12 | Lost Circulation | 621.00 | 621.00 |
| 2012-12-16 | Lost Circulation | 1190.00 | 1220.00 |
| 2012-12-21 | Lost Circulation | 1676.00 | 1676.00 |
| 2013-01-07 | Lost Circulation | 3388.00 | 3407.00 |
| 2013-02-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]