X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626062710000

Well Details

Well ID: 0626062710000
Loading map...
Location: 00/10-27-062-06W6/0
Location Alias: 00/10-27-62-06 W6M
Location Alias 2: 00/10-27-062-06 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 06
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: HARVEST KAKWA 10-27-62-6
Operator Name: Harvest Operations Corp.
License Number: 0077829
License Date: 1979-09-04
License Status: Suspension
Spud Date: 1979-09-08
Final Drill Date: 1979-11-24
Well Total Depth: 3344.00 m
Surface Hole Latitude: 54.393495
Surface Hole Longitude: -118.810686

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-09-04 Obtained License
1979-11-24 Finished Drilling
1979-11-28 Production Casing Operation Performed
1980-02-18 Perforation Treatment Performed - Jet Perforation
1980-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-27 Perforation Treatment Performed - Jet Perforation
1980-02-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-03-10 Perforation Treatment Performed - Jet Perforation
1980-03-19 Perforation Treatment Performed - Fractured
1980-03-19 Well Mode changed to Drilled and Cased
1982-09-01 Well Began Production
1982-09-01 Well Fluid changed to Gas
1982-09-01 Well Mode changed to Flowing
1998-07-01 Well Fluid changed to Gas
1998-07-01 Well Mode changed to Suspended
2001-06-19 Well Fluid changed to Gas
2001-06-19 Well Mode changed to Flowing
2005-07-01 Well Fluid changed to Gas
2005-07-01 Well Mode changed to Pumping
2013-10-31 Well Fluid changed to Gas
2013-10-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-02-18 Perforation 3197.50 3199.50 7
1980-03-10 Perforation 3082.00 3083.50 14
1980-03-10 Perforation 3073.00 3075.00 14
1980-03-19 Fracture 3073.00 3083.50 0
1980-02-18 Perforation 3201.00 3203.00 7
1980-02-18 Perforation 3206.00 3208.00 7
1980-02-20 Acid Treatment 3197.50 3208.00 0
1980-02-27 Perforation 3244.00 3250.00 7
1980-02-29 Acid Treatment 3244.00 3250.00 0
1980-03-02 Acid Treatment 3244.00 3250.00 0
1980-03-09 Packing Device Capped w/Cement 3190.00 3190.00 0
1980-03-09 Packing Device Capped w/Cement 3150.00 3150.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1837 0.0 0.0 0.0
1983 5900 0.0 0.0 0.0
1984 2889 0.0 0.0 0.0
1985 5449 0.0 0.0 0.0
1986 4315 0.0 0.0 0.0
1987 3227 0.0 0.0 0.0
1988 5868 0.0 0.0 0.0
1989 4529 0.0 0.0 0.0
1990 2687 0.0 0.0 0.0
1991 4284 0.0 0.0 0.0
1992 3710 0.0 0.0 0.0
1993 3098 0.0 0.0 0.0
1994 3637 0.0 0.0 0.0
1995 577 0.0 0.0 0.0
1997 4962 0.0 0.0 0.0
1998 504 0.0 0.0 0.0
2001 2392 0.0 0.0 0.0
2002 554 0.0 0.0 0.0
2003 3594 0.0 0.0 0.0
2004 7127 0.0 0.0 0.0
2005 6090 0.0 0.0 0.0
2006 5209 0.0 0.0 0.0
2007 7619 0.0 0.0 0.0
2008 8690 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8639 0.0 0.0 0.0
2011 8408 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 5137 0.0 0.0 0.0

For data sources see[5]

References