If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0626070216000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.325744,"lon":-118.892836,"icon":""}]} |
| Location: 00/16-02-062-07W6/0 | |
| Location Alias: 00/16-02-62-07 W6M | |
| Location Alias 2: 00/16-02-062-07 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 6 | |
| Range: 07 | |
| Section: 02 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: JUPITER HZ ROUTE 16-2-62-7 | |
| Operator Name: Jupiter Resources Inc. | |
| License Number: 0456575 | |
| License Date: 2013-04-30 | |
| License Status: Amended | |
| Spud Date: 2015-01-01 | |
| Final Drill Date: 2015-02-15 | |
| Well Total Depth: 6111.00 m | |
| Surface Hole Latitude: 54.325744 | |
| Surface Hole Longitude: -118.892836 |
| Date | Event |
|---|---|
| 2013-04-30 | Obtained License |
| 2015-01-04 | Surface Casing Operation Performed |
| 2015-01-05 | Well Log Performed |
| 2015-01-07 | Direction Drilling Operation Performed - Deviate |
| 2015-01-12 | Intermediate Casing Operation Performed |
| 2015-01-23 | Direction Drilling Operation Performed - Horizontal |
| 2015-01-23 | Well Log Performed |
| 2015-02-01 | Lost Circulation Occurred |
| 2015-02-15 | Finished Drilling |
| 2015-02-15 | Well Log Performed |
| 2015-02-15 | Well Mode changed to Drilled and Cased |
| 2015-02-21 | Liner Casing Operation Performed |
| 2015-02-24 | Rig Released |
| 2015-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-10 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-11 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-18 | Well Began Production |
| 2015-03-18 | Well Fluid changed to Gas |
| 2015-03-18 | Well Mode changed to Flowing |
| 2015-06-16 | Well Log Performed |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2015-01-01 | Nabors Drilling Limited | 58 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2015-01-07 | 830.20 | Deviate (5 - 79 degrees) |
| 2015-01-23 | 3336.10 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2015-03-09 | Multi-Stage Fracture | 6084.80 | 6084.90 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 5247.10 | 5247.20 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 5152.00 | 5152.10 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 5044.20 | 5044.30 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 4961.40 | 4961.50 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 4853.90 | 4854.00 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 4771.20 | 4771.30 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 4662.20 | 4662.30 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 4580.10 | 4580.20 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 4484.70 | 4484.80 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 4389.20 | 4389.30 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 5981.90 | 5982.00 | 0 |
| 2015-03-11 | Multi-Stage Fracture | 4305.30 | 4305.40 | 0 |
| 2015-03-11 | Multi-Stage Fracture | 4220.50 | 4220.60 | 0 |
| 2015-03-11 | Multi-Stage Fracture | 4122.30 | 4122.40 | 0 |
| 2015-03-11 | Multi-Stage Fracture | 4038.20 | 4038.30 | 0 |
| 2015-03-11 | Multi-Stage Fracture | 3940.60 | 3940.70 | 0 |
| 2015-03-11 | Multi-Stage Fracture | 3854.60 | 3854.70 | 0 |
| 2015-03-11 | Multi-Stage Fracture | 3755.00 | 3755.10 | 0 |
| 2015-03-11 | Multi-Stage Fracture | 3641.60 | 3641.70 | 0 |
| 2015-03-11 | Multi-Stage Fracture | 3519.20 | 3519.30 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 5873.20 | 5873.30 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 5790.50 | 5790.60 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 5692.60 | 5692.70 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 5609.50 | 5609.60 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 5509.90 | 5510.00 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 5425.50 | 5425.60 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 5328.60 | 5328.70 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-03-09 | 2015-03-11 | 3,237 | 15,262 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 85.232 | N/A | |||
| 30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 8.3219 | N/A | ||
| 50/140 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 2.9083 | N/A | ||
| Oil Plus | Calfrac | Quartz | 14808-60-7 | 100 | 3.8032 | N/A | ||
| DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0135 | N/A | |
| Water | 7732-18-5 | 100 | 0.0137 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0771 | N/A | |
| DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.089 | N/A | |
| Ethoxylated phenolic resin | 8300 | 100 | 0.0898 | N/A | ||||
| Isobutyl ketone | 8300 | 100 | 0.0892 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0966 | N/A | ||||
| Organic acid salts 1 | 8300 | 100 | 0.089 | N/A | ||||
| Organic acid salts 2 | 8300 | 100 | 0.0895 | N/A | ||||
| Organic acid salts 3 | 8300 | 100 | 0.0898 | N/A | ||||
| DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0761 | N/A | |
| DAP-902 | Calfrac | Scale Inhibitor | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0159 | N/A | |
| DAP-902D | Calfrac | Scale Inhibitor | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0159 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-03-08 | 2015-03-11 | Surface Water - Runoff | 9428 |
| 2015-03-11 | 2015-03-11 | Recycled Fracturing Water (treated at well site) | 562 |
| 2015-03-11 | 2015-03-11 | Recycled Fracturing Water (treated at well site) | 1867 |
| 2015-03-11 | 2015-03-11 | Recycled Fracturing Water (treated at well site) | 3632 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 5679 | 0.0 | 0.0 | 0.0 |
| 2016 | 8591 | 0.0 | 0.0 | 0.0 |
| 2017 | 7749 | 0.0 | 0.0 | 0.0 |
| 2018 | 8388 | 0.0 | 0.0 | 0.0 |
| 2019 | 8725 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-02-01 | Lost Circulation | 4630.00 | 5495.00 |
| 2015-03-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]