If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0626083415020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.404001,"lon":-119.11677,"icon":""}]} |
| Location: 02/15-34-062-08W6/0 | |
| Location Alias: 02/15-34-62-08 W6M | |
| Location Alias 2: 02/15-34-062-08 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 6 | |
| Range: 08 | |
| Section: 34 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: JUPITER 102 ROUTE 15-34-62-8 | |
| Operator Name: Jupiter Resources Inc. | |
| License Number: 0420844 | |
| License Date: 2010-06-02 | |
| License Status: Suspension | |
| Spud Date: 2011-02-25 | |
| Final Drill Date: 2011-03-21 | |
| Well Total Depth: 3819.00 m | |
| Surface Hole Latitude: 54.404001 | |
| Surface Hole Longitude: -119.116770 |
| Date | Event |
|---|---|
| 2010-06-02 | Obtained License |
| 2011-02-28 | Direction Drilling Operation Performed - Deviate |
| 2011-03-03 | Surface Casing Operation Performed |
| 2011-03-21 | Finished Drilling |
| 2011-03-21 | Well Log Performed |
| 2011-03-21 | Well Mode changed to Drilled and Cased |
| 2011-03-23 | Production Casing Operation Performed |
| 2011-03-25 | Rig Released |
| 2011-09-11 | Well Log Performed |
| 2011-09-13 | Well Log Performed |
| 2011-09-14 | Perforation Treatment Performed - Jet Perforation |
| 2011-09-18 | Perforation Treatment Performed - Fractured |
| 2011-09-18 | Well Log Performed |
| 2011-09-19 | Perforation Treatment Performed - Fractured |
| 2011-09-19 | Perforation Treatment Performed - Jet Perforation |
| 2011-09-19 | Well Log Performed |
| 2011-09-21 | Perforation Treatment Performed - Fractured |
| 2011-09-21 | Perforation Treatment Performed - Jet Perforation |
| 2011-09-21 | Well Log Performed |
| 2011-09-23 | Perforation Treatment Performed - Fractured |
| 2011-09-24 | Perforation Treatment Performed - Jet Perforation |
| 2011-09-24 | Well Log Performed |
| 2011-09-25 | Perforation Treatment Performed - Fractured |
| 2011-09-25 | Perforation Treatment Performed - Jet Perforation |
| 2011-09-25 | Well Log Performed |
| 2011-09-26 | Perforation Treatment Performed - Fractured |
| 2011-09-26 | Perforation Treatment Performed - Jet Perforation |
| 2011-09-26 | Well Log Performed |
| 2011-09-27 | Perforation Treatment Performed - Fractured |
| 2011-10-13 | Well Fluid changed to Gas |
| 2011-10-13 | Well Mode changed to Testing |
| 2011-10-18 | Well Began Production |
| 2011-10-18 | Well Fluid changed to Gas |
| 2011-10-18 | Well Mode changed to Flowing |
| 2014-10-01 | Well Fluid changed to Gas |
| 2014-10-01 | Well Mode changed to Pumping |
| 2020-03-06 | Well Fluid changed to Gas |
| 2020-03-06 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-02-28 | 152.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-09-14 | Perforation | 3797.00 | 3798.00 | 6 |
| 2011-09-19 | Perforation | 3494.00 | 3497.00 | 10 |
| 2011-09-19 | Perforation | 3480.00 | 3481.00 | 10 |
| 2011-09-19 | Fracture | 3563.00 | 3606.50 | 0 |
| 2011-09-21 | Perforation | 3448.00 | 3449.00 | 10 |
| 2011-09-21 | Perforation | 3437.50 | 3438.50 | 10 |
| 2011-09-21 | Perforation | 3422.00 | 3423.00 | 10 |
| 2011-09-21 | Perforation | 3377.00 | 3378.00 | 10 |
| 2011-09-21 | Fracture | 3480.00 | 3497.00 | 0 |
| 2011-09-23 | Fracture | 3377.00 | 3449.00 | 0 |
| 2011-09-24 | Perforation | 3320.00 | 3322.00 | 10 |
| 2011-09-14 | Perforation | 3756.50 | 3757.00 | 6 |
| 2011-09-24 | Perforation | 3306.50 | 3308.50 | 10 |
| 2011-09-25 | Perforation | 3040.50 | 3042.50 | 10 |
| 2011-09-25 | Perforation | 3020.00 | 3020.50 | 5 |
| 2011-09-25 | Perforation | 3012.50 | 3013.00 | 5 |
| 2011-09-25 | Perforation | 2996.00 | 2998.00 | 10 |
| 2011-09-25 | Fracture | 3306.50 | 3322.00 | 0 |
| 2011-09-26 | Perforation | 2369.00 | 2371.00 | 10 |
| 2011-09-26 | Perforation | 2357.00 | 2358.00 | 10 |
| 2011-09-26 | Fracture | 2996.00 | 3042.50 | 0 |
| 2011-09-27 | Fracture | 2357.00 | 2371.00 | 0 |
| 2011-09-14 | Perforation | 3681.00 | 3682.00 | 6 |
| 2011-09-14 | Perforation | 3671.00 | 3671.50 | 6 |
| 2011-09-18 | Fracture | 3671.00 | 3798.00 | 0 |
| 2011-09-19 | Perforation | 3605.50 | 3606.50 | 10 |
| 2011-09-19 | Perforation | 3598.50 | 3599.50 | 10 |
| 2011-09-19 | Perforation | 3572.00 | 3573.00 | 10 |
| 2011-09-19 | Perforation | 3563.00 | 3564.00 | 10 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 409 | 0.0 | 0.0 | 0.0 |
| 2012 | 921 | 0.0 | 0.0 | 0.0 |
| 2013 | 2952 | 0.0 | 0.0 | 0.0 |
| 2014 | 6271 | 0.0 | 0.0 | 0.0 |
| 2015 | 6913 | 0.0 | 0.0 | 0.0 |
| 2016 | 1560 | 0.0 | 0.0 | 0.0 |
| 2017 | 1973 | 0.0 | 0.0 | 0.0 |
| 2018 | 7281 | 0.0 | 0.0 | 0.0 |
For data sources see[6]