X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626091310000

Well Details

Well ID: 0626091310000
Loading map...
Location: 00/10-13-062-09W6/0
Location Alias: 00/10-13-62-09 W6M
Location Alias 2: 00/10-13-062-09 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 09
Section: 13
County/Municipality: Municipal District of Greenview No. 16
Well Name: HARVEST LYNX 10-13-62-9
Operator Name: Harvest Operations Corp.
License Number: 0075077
License Date: 1979-03-29
License Status: Issued
Spud Date: 1979-03-31
Final Drill Date: 1979-08-09
Well Total Depth: 4090.00 m
Surface Hole Latitude: 54.365604
Surface Hole Longitude: -119.209688

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-03-29 Obtained License
1979-04-21 Lost Circulation Occurred
1979-05-14 Lost Circulation Occurred
1979-05-27 Drill Stem Test Performed
1979-05-29 Drill Stem Test Performed
1979-07-12 Kick Occurred
1979-08-09 Finished Drilling
1979-08-09 Well Log Performed
1979-08-15 Drill Stem Test Performed
1979-09-01 Production Casing Operation Performed
1979-09-02 Well Mode changed to Drilled and Cased
1979-09-19 Perforation Treatment Performed - Jet Perforation
1979-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-25 Perforation Treatment Performed - Jet Perforation
1979-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-17 Perforation Treatment Performed - Fractured
1979-10-27 Perforation Treatment Performed - Jet Perforation
1979-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-02 Perforation Treatment Performed - Fractured
1979-11-08 Perforation Treatment Performed - Cement Squeeze
1979-11-10 Perforation Treatment Performed - Jet Perforation
1979-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-29 Perforation Treatment Performed - Cement Squeeze
1999-06-29 Plug Back Performed
1999-11-02 Well Began Production
1999-11-02 Well Fluid changed to Gas
1999-11-02 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-19 Perforation 3809.00 3833.00 13
1979-11-08 Cement Squeeze 3306.00 3317.00 0
1979-11-10 Perforation 3017.50 3027.00 7
1979-11-15 Acid Treatment 3017.50 3027.00 0
1979-11-16 Acid Treatment 3017.50 3027.00 0
1999-06-29 Cement Squeeze 3017.50 3027.00 0
1979-09-22 Acid Treatment 3809.00 3833.00 0
1979-09-25 Perforation 3786.50 3792.20 12
1979-09-25 Perforation 3795.00 3801.50 12
1979-10-02 Acid Treatment 3786.00 3801.50 0
1979-10-17 Fracture 3786.00 3833.00 0
1979-10-27 Perforation 3306.00 3317.00 6
1979-10-30 Acid Treatment 3306.00 3317.00 0
1979-11-02 Fracture 3306.00 3317.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 1342 0.0 0.0 0.0
2000 8138 0.0 0.0 0.0
2001 8124 0.0 0.0 0.0
2002 8010 0.0 0.0 0.0
2003 8684 0.0 0.0 0.0
2004 7989 0.0 0.0 0.0
2005 7697 0.0 0.0 0.0
2006 8663 0.0 0.0 0.0
2007 8531 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8519 0.0 0.0 0.0
2010 8495 0.0 0.0 0.0
2011 7197 0.0 0.0 0.0
2012 3943 0.0 0.0 0.0
2013 4279 0.0 0.0 0.0
2014 4732 0.0 0.0 0.0
2015 4067 0.0 0.0 0.0
2016 5801 0.0 0.0 0.0
2017 5880 0.0 0.0 0.0
2018 6279 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-04-21 Lost Circulation 1374.00 1379.00
1979-05-14 Lost Circulation 1910.00 1910.00
1979-07-12 Kick 3758.00 3758.00

For data sources see[6]

References