X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0634132914000

Well Details

Well ID: 0634132914000
Loading map...
Location: 00/14-29-063-13W4/0
Location Alias: 00/14-29-63-13 W4M
Location Alias 2: 00/14-29-063-13 W4/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 4
Range: 13
Section: 29
County/Municipality: Lac La Biche County
Well Name: BVI ET AL CRAIGEND 14-29-63-13
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0089055
License Date: 1981-02-18
License Status: RecCertified
Spud Date: 1981-02-21
Final Drill Date: 1981-02-24
Well Total Depth: 530.00 m
Surface Hole Latitude: 54.482224
Surface Hole Longitude: -111.935902

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-02-18 Obtained License
1981-02-23 Drill Stem Test Performed
1981-02-24 Finished Drilling
1981-02-25 Drill Stem Test Performed
1981-02-25 Kick Occurred
1981-02-26 Drill Stem Test Performed
1981-02-26 Production Casing Operation Performed
1981-02-26 Well Mode changed to Drilled and Cased
1982-03-31 Perforation Treatment Performed - Open-Hole Completion
1982-03-31 Well Log Performed
1982-04-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-04-01 Perforation Treatment Performed - Jet Perforation
1983-12-22 Well Began Production
1983-12-22 Well Fluid changed to Gas
1983-12-22 Well Mode changed to Flowing
1988-03-31 Well Fluid changed to Gas
1988-03-31 Well Mode changed to Suspended
1988-07-01 Well Fluid changed to Gas
1988-07-01 Well Mode changed to Flowing
1998-11-28 Perforation Treatment Performed - Jet Perforation
1998-11-28 Well Log Performed
1998-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-29 Perforation Treatment Performed - Jet Perforation
1998-11-29 Plug Back Performed
1998-11-29 Well Log Performed
1999-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-01-18 Plug Back Performed
1999-01-18 Well Log Performed
1999-01-19 Well Abandoned
1999-01-19 Well Fluid changed to Gas
1999-01-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-03-31 Open Hole/Barefoot Completion 518.00 530.00 0
1982-04-01 Packing Device Capped w/Cement 503.00 511.00 0
1982-04-01 Perforation 375.00 376.00 13
1982-04-01 Perforation 377.00 378.00 13
1998-11-28 Perforation 382.50 383.50 20
1998-11-29 Packing Device Capped w/Cement 362.00 370.00 0
1998-11-29 Perforation 340.00 341.00 13
1999-01-18 Packing Device Capped w/Cement 313.90 326.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 740 0.0 0.0 0.0
1984 5040 0.0 0.0 0.0
1985 3425 0.0 0.0 0.0
1986 3184 0.0 0.0 0.0
1987 731 0.0 0.0 0.0
1988 1928 0.0 0.0 0.0
1989 1034 0.0 0.0 0.0
1990 6114 0.0 0.0 0.0
1991 2258 0.0 0.0 0.0
1992 6139 0.0 0.0 0.0
1993 8614 0.0 0.0 0.0
1994 303 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-02-25 Kick 518.50 518.50

For data sources see[6]

References