X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0634161910002

Well Details

Well ID: 0634161910002
Loading map...
Location: 00/10-19-063-16W4/2
Location Alias: 00/10-19-63-16 W4M
Location Alias 2: 00/10-19-063-16 W4/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 4
Range: 16
Section: 19
County/Municipality: Buffalo Lake Metis Settlement
Well Name: PINE CLIFF FIGURE 10-19-63-16
Operator Name: Pine Cliff Energy Ltd.
License Number: 0016292
License Date: 1958-11-21
License Status: Abandoned
Spud Date: 1958-12-14
Final Drill Date: 1958-12-26
Well Total Depth: 701.00 m
Surface Hole Latitude: 54.465434
Surface Hole Longitude: -112.409392

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-11-21 Obtained License
1958-12-19 Drill Stem Test Performed
1958-12-20 Drill Stem Test Performed
1958-12-22 Drill Stem Test Performed
1958-12-23 Drill Stem Test Performed
1958-12-25 Drill Stem Test Performed
1958-12-26 Drill Stem Test Performed
1958-12-26 Finished Drilling
1958-12-27 Production Casing Operation Performed
1959-01-12 Perforation Treatment Performed - Bullet Perforation
1959-01-13 Perforation Treatment Performed - Acid Wash - No Pressure
1995-01-28 Perforation Treatment Performed - Jet Perforation
1995-01-28 Well Mode changed to Drilled and Cased
1996-01-21 Well Began Production
1996-01-21 Well Fluid changed to Gas
1996-01-21 Well Mode changed to Flowing
1996-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-23 Perforation Treatment Performed - Jet Perforation
1996-03-23 Plug Back Performed
1996-03-23 Well Fluid changed to Gas
1996-03-23 Well Mode changed to Abandoned Zone
1996-03-29 Well Log Performed
1998-01-15 Well Abandoned
1998-01-15 Well Fluid changed to Gas
1998-01-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-01-12 Bullet Perforation 661.40 668.10 20
1959-01-13 Acid Wash 661.40 668.10 0
1995-01-28 Perforation 641.00 642.00 13
1995-01-28 Perforation 642.00 642.50 13
1996-03-23 Packing Device Capped w/Cement 628.00 636.00 0
1996-03-23 Perforation 574.00 576.00 13
1996-03-23 Packing Device Capped w/Cement 561.00 569.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 355 0.0 0.0 0.0

For data sources see[5]

References