X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0634252916002

Well Details

Well ID: 0634252916002
Loading map...
Location: 00/16-29-063-25W4/2
Location Alias: 00/16-29-63-25 W4M
Location Alias 2: 00/16-29-063-25 W4/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 4
Range: 25
Section: 29
County/Municipality: Westlock County
Well Name: CNRES BOLLOQUE 16-29-63-25
Operator Name: Canadian Natural Resources Limited
License Number: 0197509
License Date: 1997-02-03
License Status: RecCertified
Spud Date: 1997-02-04
Final Drill Date: 1997-02-08
Well Total Depth: 953.00 m
Surface Hole Latitude: 54.482194
Surface Hole Longitude: -113.740424

For data sources see[1][2]

Well History

Date Event
1997-02-02 Well Log Performed
1997-02-03 Obtained License
1997-02-05 Surface Casing Operation Performed
1997-02-08 Finished Drilling
1997-02-08 Lost Circulation Occurred
1997-02-08 Well Mode changed to Drilled and Cased
1997-02-09 Kick Occurred
1997-02-12 Well Log Performed
1997-02-13 Production Casing Operation Performed
1997-02-13 Rig Released
1997-02-20 Well Log Performed
1997-02-21 Well Log Performed
1997-02-22 Perforation Treatment Performed - Jet Perforation
1997-02-22 Well Log Performed
1997-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-23 Perforation Treatment Performed - Jet Perforation
1998-07-07 Perforation Treatment Performed - Chemical Squeeze
2000-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-24 Plug Back Performed
2000-01-25 Perforation Treatment Performed - Jet Perforation
2000-01-25 Well Log Performed
2000-02-25 Well Mode changed to Drilled and Cased
2000-02-26 Well Began Production
2000-02-26 Well Fluid changed to Gas
2000-02-26 Well Mode changed to Flowing
2003-10-31 Well Fluid changed to Gas
2003-10-31 Well Mode changed to Suspended
2004-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-03-10 Perforation Treatment Performed - Jet Perforation
2004-03-10 Plug Back Performed
2004-03-10 Well Fluid changed to Gas
2004-03-10 Well Log Performed
2004-03-10 Well Mode changed to Abandoned Zone
2004-03-11 Perforation Treatment Performed - Cement Plug
2004-03-11 Perforation Treatment Performed - Remedial Casing
2004-03-12 Well Log Performed
2004-03-17 Well Abandoned
2004-03-17 Well Fluid changed to Gas
2004-03-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-02-22 Perforation 940.50 942.50 13
2004-03-11 Remedial Casing Cementing 277.00 280.00 0
2004-03-11 Cement Plug 160.00 280.00 0
1997-02-23 Packing Device Capped w/Cement 927.00 935.00 0
1997-02-23 Perforation 893.50 896.00 13
1997-02-23 Perforation 897.50 899.00 13
1998-07-07 Chemical Squeeze 893.50 899.00 0
2000-01-24 Packing Device Capped w/Cement 880.00 888.00 0
2000-01-25 Perforation 709.00 710.00 20
2004-03-10 Packing Device Capped w/Cement 697.00 705.00 0
2004-03-10 Perforation 277.00 280.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 6138 0.0 0.0 0.0
2001 951 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-02-08 Lost Circulation 953.00 953.00
1997-02-09 Kick 953.00 953.00

For data sources see[6]

References