If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635063001000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.475902,"lon":-114.888958,"icon":""}]} |
Location: 00/01-30-063-06W5/0 | |
Location Alias: 00/01-30-63-06 W5M | |
Location Alias 2: 00/01-30-063-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 06 | |
Section: 30 | |
County/Municipality: Woodlands County | |
Well Name: Trident Expl WX DORIS 1-30-63-6 | |
Operator Name: Trident Exploration (wx) Corp. | |
License Number: 0344105 | |
License Date: 2005-12-01 | |
License Status: Issued | |
Spud Date: 2006-02-12 | |
Final Drill Date: 2006-02-20 | |
Well Total Depth: 1579.00 m | |
Surface Hole Latitude: 54.475902 | |
Surface Hole Longitude: -114.888958 |
Date | Event |
---|---|
2002-02-13 | Surface Casing Operation Performed |
2005-12-01 | Obtained License |
2006-02-12 | Well Log Performed |
2006-02-17 | Well Log Performed |
2006-02-18 | Intermediate Casing Operation Performed |
2006-02-20 | Finished Drilling |
2006-02-20 | Perforation Treatment Performed - Open-Hole Completion |
2006-02-20 | Well Mode changed to Drilled and Cased |
2006-02-21 | Rig Released |
2006-03-05 | Well Log Performed |
2006-03-06 | Perforation Treatment Performed - Open-Hole Completion |
2006-03-15 | Well Log Performed |
2006-07-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2006-08-01 | Well Began Injection |
2006-08-01 | Well Fluid changed to Water |
2006-08-01 | Well Type changed to Disposal |
2006-11-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2006-12-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-01-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-03-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-03-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-06-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-10-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-11-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-11-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2008-10-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-02-20 | Open Hole/Barefoot Completion | 1356.00 | 1579.00 | 0 |
2007-10-19 | Acid Treatment | 1356.10 | 1579.00 | 0 |
2007-11-05 | Acid Treatment | 1356.10 | 1579.00 | 0 |
2007-11-13 | Acid Treatment | 1356.10 | 1579.00 | 0 |
2008-10-31 | Acid Treatment | 1356.10 | 1579.00 | 0 |
2006-03-06 | Open Hole/Barefoot Completion | 1356.10 | 1579.00 | 0 |
2006-07-21 | Acid Treatment | 1356.10 | 1579.00 | 0 |
2006-11-02 | Acid Treatment | 1356.10 | 1579.00 | 0 |
2006-12-21 | Acid Treatment | 1356.10 | 1579.00 | 0 |
2007-01-23 | Acid Treatment | 1356.10 | 1579.00 | 0 |
2007-03-01 | Acid Treatment | 1356.10 | 1579.00 | 0 |
2007-03-15 | Acid Treatment | 1356.10 | 1579.00 | 0 |
2007-06-01 | Acid Treatment | 1356.10 | 1579.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 0 | 0.0 | 0.0 | 0.0 |
2007 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]