X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635102002000

Well Details

Well ID: 0635102002000
Loading map...
Location: 00/02-20-063-10W5/0
Location Alias: 00/02-20-63-10 W5M
Location Alias 2: 00/02-20-063-10 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 20
County/Municipality: Woodlands County
Well Name: IMP JUDY CREEK 2-20BL-63-10
Operator Name: Cona Resources Ltd.
License Number: 0021775
License Date: 1961-12-05
License Status: RecCertified
Spud Date: 1961-12-08
Final Drill Date: 1962-01-01
Well Total Depth: 2656.60 m
Surface Hole Latitude: 54.459701
Surface Hole Longitude: -115.473032

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-12-05 Obtained License
1962-01-01 Finished Drilling
1962-01-01 Well Mode changed to Drilled and Cased
1962-01-03 Production Casing Operation Performed
1962-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-26 Perforation Treatment Performed - Jet Perforation
1962-02-02 Well Began Production
1962-02-02 Well Fluid changed to Crude Oil
1962-02-02 Well Mode changed to Flowing
1981-11-01 Well Fluid changed to Crude Oil
1981-11-01 Well Mode changed to Suspended
1982-12-07 Perforation Treatment Performed - Jet Perforation
1982-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-17 Well Fluid changed to Crude Oil
1982-12-17 Well Mode changed to Pumping
1983-06-01 Well Fluid changed to Crude Oil
1983-06-01 Well Mode changed to Suspended
1996-07-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-22 Perforation Treatment Performed - Jet Perforation
1996-07-22 Plug Back Performed
1996-08-21 Perforation Treatment Performed - Remedial Casing
1996-08-25 Well Abandoned
1996-08-25 Well Fluid changed to Crude Oil
1996-08-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-01-26 Perforation 2627.10 2628.90 3
1996-08-21 Remedial Casing Cementing 331.00 332.00 0
1962-01-26 Acid Treatment 2627.10 2628.90 0
1982-12-07 Perforation 2611.20 2613.00 7
1982-12-07 Perforation 2614.00 2614.90 7
1982-12-07 Perforation 2615.50 2617.60 7
1982-12-07 Perforation 2619.40 2620.70 7
1982-12-09 Acid Treatment 2611.20 2620.70 0
1996-07-22 Packing Device Capped w/Cement 2592.00 2600.00 0
1996-07-22 Perforation 331.00 332.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1982 254 0.0 0.0 0.0
1983 2803 0.0 0.0 0.0

For data sources see[5]

References