X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635110710000

Well Details

Well ID: 0635110710000
Loading map...
Location: 00/10-07-063-11W5/0
Location Alias: 00/10-07-63-11 W5M
Location Alias 2: 00/10-07-063-11 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 11
Section: 07
County/Municipality: Woodlands County
Well Name: IMP JUDY WEST IN 10-7BL-63-11
Operator Name: Cona Resources Ltd.
License Number: 0022479
License Date: 1962-05-30
License Status: RecCertified
Spud Date: 1962-08-12
Final Drill Date: 1962-09-01
Well Total Depth: 2696.00 m
Surface Hole Latitude: 54.438134
Surface Hole Longitude: -115.648287

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-05-30 Obtained License
1962-09-01 Finished Drilling
1962-09-01 Well Mode changed to Drilled and Cased
1962-09-03 Production Casing Operation Performed
1962-09-16 Perforation Treatment Performed - Bullet Perforation
1962-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-09-17 Perforation Treatment Performed - Bullet Perforation
1962-09-22 Well Began Production
1962-09-22 Well Fluid changed to Crude Oil
1962-09-22 Well Mode changed to Flowing
1962-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-11-11 Well Fluid changed to Crude Oil
1962-11-11 Well Mode changed to Pumping
1963-09-19 Perforation Treatment Performed - Jet Perforation
1963-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-28 Perforation Treatment Performed - Cement Squeeze
1964-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-09-18 Well Fluid changed to Crude Oil
1964-09-18 Well Mode changed to Suspended
1966-10-29 Perforation Treatment Performed - Cement Squeeze
1966-11-01 Perforation Treatment Performed - Cement Squeeze
1966-11-03 Perforation Treatment Performed - Cement Squeeze
1966-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-11-12 Perforation Treatment Performed - Jet Perforation
1967-03-19 Well Began Injection
1967-03-19 Well Fluid changed to Water
1967-03-19 Well Type changed to Injection
1968-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-01 Well Fluid changed to Water
1983-08-01 Well Mode changed to Suspended
1983-08-01 Well Type changed to Injection
1995-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-15 Perforation Treatment Performed - Jet Perforation
1995-06-15 Plug Back Performed
1995-06-15 Well Fluid changed to Water
1995-06-15 Well Mode changed to Abandoned
1995-06-15 Well Type changed to Injection
1995-07-12 Perforation Treatment Performed - Remedial Casing
1995-07-12 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-09-16 Bullet Perforation 2652.40 2653.60 7
1964-07-13 Acid Treatment 2624.60 2653.60 0
1964-08-28 Cement Squeeze 2648.70 2653.60 0
1964-09-03 Acid Treatment 2624.60 2628.60 0
1964-09-04 Acid Treatment 2624.60 2628.60 0
1966-10-29 Cement Squeeze 2624.60 2628.60 0
1966-11-01 Cement Squeeze 2624.60 2628.60 0
1966-11-03 Cement Squeeze 2624.60 2628.60 0
1966-11-12 Perforation 2673.10 2683.50 3
1966-11-12 Acid Treatment 2673.10 2683.50 0
1968-03-12 Acid Treatment 2673.10 2683.50 0
1962-09-17 Bullet Perforation 2648.70 2649.90 0
1969-10-31 Acid Treatment 2673.10 2683.50 0
1973-11-14 Acid Treatment 2673.10 2683.50 0
1980-02-29 Acid Treatment 2673.10 2683.50 0
1995-06-15 Packing Device Capped w/Cement 2609.00 2617.00 0
1995-06-15 Perforation 311.00 312.00 13
1995-07-12 Remedial Casing Cementing 311.00 312.00 0
1962-09-17 Acid Treatment 2648.70 2653.60 0
1962-10-06 Acid Treatment 2648.70 2653.60 0
1963-09-19 Perforation 2624.60 2624.90 7
1963-09-19 Perforation 2625.50 2625.90 7
1963-09-19 Perforation 2626.50 2627.10 7
1963-09-19 Perforation 2628.00 2628.60 7
1963-09-20 Acid Treatment 2624.60 2653.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0

For data sources see[5]

References