X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635121502000

Well Details

Well ID: 0635121502000
Loading map...
Location: 00/02-15-063-12W5/0
Location Alias: 00/02-15-63-12 W5M
Location Alias 2: 00/02-15-063-12 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 12
Section: 15
County/Municipality: Woodlands County
Well Name: IMP JUDY WEST IN 2-15BL-63-12
Operator Name: Cona Resources Ltd.
License Number: 0024608
License Date: 1963-08-02
License Status: RecCertified
Spud Date: 1963-08-09
Final Drill Date: 1963-08-31
Well Total Depth: 2765.50 m
Surface Hole Latitude: 54.445862
Surface Hole Longitude: -115.723406

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-08-02 Obtained License
1963-08-10 Lost Circulation Occurred
1963-08-31 Finished Drilling
1963-08-31 Well Mode changed to Drilled and Cased
1963-09-01 Production Casing Operation Performed
1963-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-09-11 Perforation Treatment Performed - Jet Perforation
1963-09-24 Perforation Treatment Performed - Cement Squeeze
1963-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-09-26 Perforation Treatment Performed - Jet Perforation
1963-11-05 Well Began Production
1963-11-05 Well Fluid changed to Crude Oil
1963-11-05 Well Mode changed to Flowing
1964-01-21 Perforation Treatment Performed - Cement Squeeze
1964-01-22 Perforation Treatment Performed - Jet Perforation
1964-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-24 Well Began Injection
1964-01-24 Well Fluid changed to Water
1964-01-24 Well Type changed to Injection
1964-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-12-12 Perforation Treatment Performed - Acid Wash - No Pressure
1972-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-07-28 Perforation Treatment Performed - Jet Perforation
1973-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-01 Well Fluid changed to Water
1983-08-01 Well Mode changed to Suspended
1983-08-01 Well Type changed to Injection
1986-05-01 Well Fluid changed to Water
1986-05-01 Well Type changed to Injection
1986-05-31 Well Fluid changed to Water
1986-05-31 Well Mode changed to Suspended
1986-05-31 Well Type changed to Injection
1987-05-19 Well Log Performed
1987-05-20 Well Log Performed
1995-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-18 Perforation Treatment Performed - Jet Perforation
1995-06-18 Plug Back Performed
1995-06-18 Well Fluid changed to Water
1995-06-18 Well Mode changed to Abandoned
1995-06-18 Well Type changed to Injection
1995-07-13 Perforation Treatment Performed - Remedial Casing
1995-07-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-09-11 Perforation 2686.20 2686.80 3
1964-01-22 Perforation 2738.00 2751.70 3
1964-01-24 Acid Treatment 2714.90 2751.70 0
1964-03-03 Acid Treatment 2714.90 2751.70 0
1964-10-14 Acid Treatment 2714.90 2751.70 0
1966-09-16 Acid Treatment 2738.00 2751.70 0
1966-09-16 Acid Treatment 2747.20 2765.50 0
1966-09-16 Acid Treatment 2743.20 2747.20 0
1966-09-22 Acid Treatment 2714.90 2734.70 0
1966-09-22 Acid Treatment 2736.50 2743.20 0
1966-09-22 Acid Treatment 2730.10 2736.50 0
1963-09-11 Perforation 2687.40 2688.00 3
1966-09-22 Acid Treatment 2725.20 2730.10 0
1966-09-22 Acid Treatment 2720.90 2725.20 0
1967-12-12 Acid Wash 2714.90 2751.70 0
1972-07-28 Perforation 2686.80 2696.90 7
1972-07-28 Acid Treatment 2686.80 2696.90 0
1973-10-29 Acid Treatment 2686.80 2696.90 0
1995-06-18 Packing Device Capped w/Cement 2672.00 2680.00 0
1995-06-18 Perforation 393.50 394.50 13
1995-07-13 Remedial Casing Cementing 393.50 394.50 0
1963-09-11 Acid Treatment 2686.20 2688.00 0
1963-09-24 Cement Squeeze 2686.20 2688.00 0
1963-09-26 Perforation 2685.60 2686.50 3
1963-09-26 Acid Treatment 2685.60 2686.50 0
1964-01-21 Cement Squeeze 2685.60 2686.50 0
1964-01-22 Perforation 2714.90 2728.60 3
1964-01-22 Perforation 2731.30 2734.70 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1963-08-10 Lost Circulation 60.90 60.90

For data sources see[6]

References