X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635182702000

Well Details

Well ID: 0635182702000
Loading map...
Location: 00/02-27-063-18W5/0
Location Alias: 00/02-27-63-18 W5M
Location Alias 2: 00/02-27-063-18 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 18
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: RIDGEBACK KAYBOB 2-27-63-18
Operator Name: Ridgeback Resources Inc.
License Number: 0437589
License Date: 2011-10-11
License Status: Suspension
Spud Date: 2011-12-06
Final Drill Date: 2011-12-22
Well Total Depth: 3688.00 m
Surface Hole Latitude: 54.473497
Surface Hole Longitude: -116.662495

For data sources see[1][2]

Well History

Date Event
2011-10-11 Obtained License
2011-12-07 Surface Casing Operation Performed
2011-12-12 Direction Drilling Operation Performed - Horizontal
2011-12-13 Well Log Performed
2011-12-15 Intermediate Casing Operation Performed
2011-12-22 Finished Drilling
2011-12-22 Well Log Performed
2011-12-22 Well Mode changed to Drilled and Cased
2011-12-24 Liner Casing Operation Performed
2011-12-24 Perforation Treatment Performed - Open-Hole Completion
2011-12-26 Rig Released
2012-02-07 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2012-04-01 Well Began Production
2012-04-01 Well Fluid changed to Crude Oil
2012-04-01 Well Mode changed to Flowing
2012-11-13 Well Log Performed
2016-05-01 Well Fluid changed to Crude Oil
2016-05-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-12 1522.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-24 Open Hole/Barefoot Completion 3682.00 3688.00 0
2012-02-08 Multi-Stage Fracture 3026.90 3027.00 0
2012-02-08 Multi-Stage Fracture 2938.10 2938.20 0
2012-02-08 Multi-Stage Fracture 2876.90 2877.00 0
2012-02-08 Multi-Stage Fracture 2787.70 2787.80 0
2012-02-08 Multi-Stage Fracture 2712.60 2712.70 0
2012-02-08 Multi-Stage Fracture 2639.10 2639.20 0
2012-02-08 Multi-Stage Fracture 2563.50 2563.60 0
2012-02-08 Multi-Stage Fracture 2488.50 2488.60 0
2012-02-08 Multi-Stage Fracture 2412.90 2413.00 0
2012-02-08 Multi-Stage Fracture 2337.40 2337.50 0
2012-02-07 Multi-Stage Fracture 3626.80 3626.90 0
2012-02-08 Multi-Stage Fracture 2262.40 2262.50 0
2012-02-08 Multi-Stage Fracture 2186.30 2186.40 0
2012-02-08 Multi-Stage Fracture 2111.80 2111.90 0
2012-02-07 Multi-Stage Fracture 3549.50 3549.60 0
2012-02-07 Multi-Stage Fracture 3474.90 3475.00 0
2012-02-07 Multi-Stage Fracture 3400.40 3400.50 0
2012-02-07 Multi-Stage Fracture 3326.80 3326.90 0
2012-02-07 Multi-Stage Fracture 3252.20 3252.30 0
2012-02-07 Multi-Stage Fracture 3177.30 3177.40 0
2012-02-07 Multi-Stage Fracture 3102.10 3102.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 772 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-14 No Incident Encountered 0.00 0.00

For data sources see[7]

References