X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635191910000

Well Details

Well ID: 0635191910000
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Location: 00/10-19-063-19W5/0
Location Alias: 00/10-19-63-19 W5M
Location Alias 2: 00/10-19-063-19 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 19
Section: 19
County/Municipality: Municipal District of Greenview No. 16
Well Name: RESPONSE KAYBOB 10-19-63-19
Operator Name: Response Energy Corporation
License Number: 0122686
License Date: 1986-02-26
License Status: Abandoned
Spud Date: 1986-03-06
Final Drill Date: 1986-04-02
Well Total Depth: 2235.00 m
Surface Hole Latitude: 54.463743
Surface Hole Longitude: -116.867153

For data sources see[1][2]

Well History

Date Event
1986-02-26 Obtained License
1986-03-06 Lost Circulation Occurred
1986-03-07 Lost Circulation Occurred
1986-03-09 Surface Casing Operation Performed
1986-03-12 Direction Drilling Operation Performed - Deviate
1986-04-02 Finished Drilling
1986-04-04 Well Log Performed
1986-04-05 Production Casing Operation Performed
1986-04-06 Rig Released
1986-04-11 Well Log Performed
1986-08-08 Well Log Performed
1986-08-10 Perforation Treatment Performed - Jet Perforation
1986-08-12 Perforation Treatment Performed - Fractured
1986-08-16 Well Log Performed
1986-08-18 Well Mode changed to Drilled and Cased
1986-09-16 Well Began Production
1986-09-16 Well Fluid changed to Crude Oil
1986-09-16 Well Mode changed to Flowing
1986-11-15 Well Fluid changed to Crude Oil
1986-11-15 Well Mode changed to Suspended
1995-02-21 Perforation Treatment Performed - Jet Perforation
1995-02-25 Perforation Treatment Performed - Cement Squeeze
1995-02-25 Plug Back Performed
1995-03-03 Perforation Treatment Performed - Jet Perforation
1995-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-03-10 Perforation Treatment Performed - Jet Perforation
1995-03-10 Plug Back Performed
1995-03-11 Perforation Treatment Performed - Remedial Casing
1995-03-11 Well Abandoned
1995-03-11 Well Fluid changed to Crude Oil
1995-03-11 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1986-03-12 575.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-08-10 Perforation 2138.50 2143.00 13
1986-08-12 Fracture 2138.50 2143.00 0
1995-02-21 Perforation 2118.00 2132.00 13
1995-02-25 Cement Squeeze 2118.00 2143.00 0
1995-03-03 Perforation 2123.00 2132.00 13
1995-03-06 Acid Treatment 2123.00 2132.00 0
1995-03-10 Packing Device Capped w/Cement 2107.00 2115.00 0
1995-03-10 Perforation 400.00 400.30 13
1995-03-11 Remedial Casing Cementing 400.00 400.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 1342 0.0 0.0 0.0
1993 24 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1986-03-06 Lost Circulation 53.00 53.00
1986-03-07 Lost Circulation 107.00 118.00

For data sources see[7]

References

BESbswy