X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635192710020

Well Details

Well ID: 0635192710020
Loading map...
Location: 02/10-27-063-19W5/0
Location Alias: 02/10-27-63-19 W5M
Location Alias 2: 02/10-27-063-19 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 19
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: SOC KAYBOB 10-27-63-19
Operator Name: AlphaBow Energy Ltd.
License Number: 0076558
License Date: 1979-06-25
License Status: Suspension
Spud Date: 1979-07-03
Final Drill Date: 1979-07-18
Well Total Depth: 1837.00 m
Surface Hole Latitude: 54.480429
Surface Hole Longitude: -116.782980

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-06-25 Obtained License
1979-07-12 Drill Stem Test Performed
1979-07-17 Drill Stem Test Performed
1979-07-18 Finished Drilling
1979-07-20 Production Casing Operation Performed
1979-10-30 Perforation Treatment Performed - Jet Perforation
1979-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-06 Perforation Treatment Performed - Fractured
1979-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-28 Well Mode changed to Drilled and Cased
1993-10-26 Well Fluid changed to Gas
1993-10-26 Well Mode changed to Testing
1993-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-27 Plug Back Performed
1993-10-27 Well Fluid changed to Gas
1993-10-27 Well Mode changed to Abandoned Zone
1993-10-29 Perforation Treatment Performed - Jet Perforation
1993-10-29 Well Log Performed
1993-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-10-30 Perforation 1801.50 1804.00 13
1979-11-02 Acid Treatment 1801.50 1804.00 0
1979-11-06 Fracture 1801.50 1804.00 0
1979-11-14 Acid Treatment 1801.50 1804.00 0
1993-10-27 Packing Device Capped w/Cement 1783.00 1791.00 0
1993-10-29 Perforation 1527.40 1532.40 13
1993-10-31 Acid Treatment 1527.40 1532.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 185 0.0 0.0 0.0

For data sources see[5]

References