If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0635193510000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.498193,"lon":-116.716641,"icon":""}]} |
| Location: 00/10-35-063-19W5/0 | |
| Location Alias: 00/10-35-63-19 W5M | |
| Location Alias 2: 00/10-35-063-19 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 063 | |
| Meridian: 5 | |
| Range: 19 | |
| Section: 35 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: RIDGEBACK HZ KAYBOB 10-35-63-19 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0494789 | |
| License Date: 2019-06-10 | |
| License Status: Amended | |
| Spud Date: 2019-09-26 | |
| Final Drill Date: 2019-10-05 | |
| Well Total Depth: 4527.00 m | |
| Surface Hole Latitude: 54.498193 | |
| Surface Hole Longitude: -116.716641 |
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2019-09-26 | Predator Drilling Inc. | 391 | Drill To LD |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2019-09-28 | 1468.00 | Deviate (5 - 79 degrees) |
| 2019-09-30 | 2016.60 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2019-10-06 | Open Hole/Barefoot Completion | 4521.00 | 4527.00 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3980.40 | 3980.50 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3923.80 | 3923.90 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3867.00 | 3867.10 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3811.30 | 3811.40 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3768.70 | 3768.80 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3712.00 | 3712.10 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3655.30 | 3655.40 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3598.60 | 3598.70 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3555.70 | 3555.80 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3499.20 | 3499.30 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 4498.00 | 4498.10 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3442.50 | 3442.60 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3386.00 | 3386.10 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3343.60 | 3343.70 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3286.90 | 3287.00 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3230.20 | 3230.30 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3173.70 | 3173.80 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3130.80 | 3130.90 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3074.10 | 3074.20 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 3017.70 | 3017.80 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 2961.10 | 2961.20 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 4449.10 | 4449.20 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 2918.10 | 2918.20 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 2861.40 | 2861.50 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 2804.80 | 2804.90 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 2748.30 | 2748.40 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 2705.30 | 2705.40 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 2648.60 | 2648.70 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 2591.90 | 2592.00 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 2549.10 | 2549.20 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 2492.60 | 2492.70 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 2436.40 | 2436.50 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 4392.60 | 4392.70 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 2379.70 | 2379.80 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 2336.70 | 2336.80 | 0 |
| 2019-11-08 | Multi-Stage Fracture | 2280.20 | 2280.30 | 0 |
| 2019-11-08 | Multi-Stage Fracture | 2223.50 | 2223.60 | 0 |
| 2019-11-08 | Multi-Stage Fracture | 2180.50 | 2180.60 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 4349.60 | 4349.70 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 4179.60 | 4179.70 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 4136.70 | 4136.80 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 4080.00 | 4080.10 | 0 |
| 2019-11-07 | Multi-Stage Fracture | 4023.30 | 4023.40 | 0 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2019-11-07 | 2019-11-08 | 1,859 | 2,979 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 90.0724 | N/A | |||
| 20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 9.9275 | N/A | ||
| ELEBR-4 | Element | Breaker | Ammonium persulfate | 7727-54-0 | 100 | 0.0072 | N/A | |
| ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.2722 | N/A | |
| Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.2722 | N/A | ||||
| ELEScale-2 | Element | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 100 | 0.0236 | N/A | |
| Methanol | 67-56-1 | 100 | 0.0236 | N/A | ||||
| Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0236 | N/A | ||||
| Organophosphonate | 15827-60-8 | 100 | 0.0236 | N/A | ||||
| ELEFE-4 IFTR | Element | Surfactant | Alkylbenzenesulfonic acid | Trade Secret | 100 | 0.0839 | N/A | |
| Ethylene Glycol | 107-21-1 | 100 | 0.0839 | N/A | ||||
| Isopropanol | 67-63-0 | 100 | 0.0839 | N/A | ||||
| Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0839 | N/A |
For data sources see[6]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2019-11-06 | 2019-11-07 | Central Water Distribution Facility | 3140 |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2019 | 649 | 0.0 | 0.0 | 0.0 |
| 2020 | 2111 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-10-06 | No Incident Encountered | 0.00 | 0.00 |
| 2019-11-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]