X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635231801000

Well Details

Well ID: 0635231801000
Loading map...
Location: 00/01-18-063-23W5/0
Location Alias: 00/01-18-63-23 W5M
Location Alias 2: 00/01-18-063-23 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 23
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: RIDGEBACK WAHIGAN 1-18-63-23
Operator Name: Ridgeback Resources Inc.
License Number: 0325301
License Date: 2005-01-28
License Status: Abandoned
Spud Date: 2005-02-20
Final Drill Date: 2005-03-02
Well Total Depth: 2280.00 m
Surface Hole Latitude: 54.442633
Surface Hole Longitude: -117.462281

For data sources see[1][2]

Well History

Date Event
2005-01-28 Obtained License
2005-02-22 Surface Casing Operation Performed
2005-02-26 Direction Drilling Operation Performed - Deviate
2005-03-02 Finished Drilling
2005-03-02 Well Mode changed to Drilled and Cased
2005-03-03 Well Log Performed
2005-03-04 Production Casing Operation Performed
2005-03-05 Rig Released
2005-08-21 Perforation Treatment Performed - Jet Perforation
2005-08-25 Perforation Treatment Performed - Fractured
2005-09-13 Perforation Treatment Performed - Jet Perforation
2005-09-23 Perforation Treatment Performed - Fractured
2005-10-18 Well Began Production
2005-10-18 Well Fluid changed to Crude Oil
2005-10-18 Well Mode changed to Pumping
2007-05-01 Well Fluid changed to Crude Oil
2007-05-01 Well Mode changed to Suspended
2019-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-11-29 Perforation Treatment Performed - Cement Plug
2019-11-29 Perforation Treatment Performed - Jet Perforation
2019-11-29 Plug Back Performed
2019-11-29 Well Log Performed
2019-11-30 Perforation Treatment Performed - Jet Perforation
2019-11-30 Well Log Performed
2019-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-12-01 Perforation Treatment Performed - Cement Squeeze
2019-12-01 Perforation Treatment Performed - Jet Perforation
2019-12-01 Plug Back Performed
2019-12-01 Well Log Performed
2019-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-12-02 Perforation Treatment Performed - Cement Squeeze
2019-12-02 Plug Back Performed
2019-12-02 Well Fluid changed to Crude Oil
2019-12-02 Well Mode changed to Abandoned Zone
2020-02-01 Well Abandoned
2020-02-01 Well Fluid changed to Crude Oil
2020-02-01 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-02-26 1460.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-08-21 Perforation 2183.00 2185.00 17
2019-11-30 Perforation 755.00 756.00 20
2019-12-01 Cement Squeeze 755.00 756.00 0
2019-12-01 Packing Device Capped w/Cement 732.00 752.00 0
2019-12-01 Perforation 357.00 358.00 20
2019-12-02 Cement Squeeze 357.00 358.00 0
2019-12-02 Packing Device Capped w/Cement 267.00 347.00 0
2005-08-21 Perforation 2175.00 2177.00 17
2005-08-25 Fracture 2183.00 2185.00 0
2005-08-25 Fracture 2175.00 2177.00 0
2005-09-13 Perforation 2143.00 2146.00 17
2005-09-23 Fracture 2143.00 2146.00 0
2019-11-29 Packing Device Capped w/Cement 2128.50 2136.50 0
2019-11-29 Perforation 1085.00 1086.00 20
2019-11-29 Cement Plug 1065.00 1101.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 922 0.0 0.0 0.0
2006 20 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-12-02 No Incident Encountered 0.00 0.00

For data sources see[7]

References