If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635232504000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.477539,"lon":-117.327635,"icon":""}]} |
Location: 00/04-25-063-23W5/0 | |
Location Alias: 00/04-25-63-23 W5M | |
Location Alias 2: 00/04-25-063-23 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 23 | |
Section: 25 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TANGLE CREEK HZ WAHIGAN 4-25-63-23 | |
Operator Name: Tangle Creek Energy Ltd. | |
License Number: 0444685 | |
License Date: 2012-03-05 | |
License Status: Issued | |
Spud Date: 2012-08-07 | |
Final Drill Date: 2012-08-19 | |
Well Total Depth: 3844.00 m | |
Surface Hole Latitude: 54.477539 | |
Surface Hole Longitude: -117.327635 |
Date | Event |
---|---|
2012-03-05 | Obtained License |
2012-08-08 | Surface Casing Operation Performed |
2012-08-10 | Direction Drilling Operation Performed - Deviate |
2012-08-14 | Direction Drilling Operation Performed - Horizontal |
2012-08-15 | Intermediate Casing Operation Performed |
2012-08-19 | Finished Drilling |
2012-08-19 | Well Mode changed to Drilled and Cased |
2012-08-20 | Well Log Performed |
2012-08-22 | Liner Casing Operation Performed |
2012-08-22 | Rig Released |
2012-08-30 | Well Log Performed |
2012-09-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-01 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-09 | Well Began Production |
2012-09-09 | Well Fluid changed to Crude Oil |
2012-09-09 | Well Mode changed to Flowing |
2012-09-24 | Well Fluid changed to Crude Oil |
2012-09-24 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-08-08 | Beaver Drilling Ltd. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-10 | 1226.30 | Deviate (5 - 79 degrees) |
2012-08-14 | 2339.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-01 | Open Hole/Barefoot Completion | 3839.00 | 3844.00 | 0 |
2012-09-01 | Multi-Stage Fracture | 3156.00 | 3156.10 | 0 |
2012-09-01 | Multi-Stage Fracture | 3072.80 | 3072.90 | 0 |
2012-09-01 | Multi-Stage Fracture | 2987.70 | 2987.80 | 0 |
2012-09-01 | Multi-Stage Fracture | 2917.20 | 2917.30 | 0 |
2012-09-01 | Multi-Stage Fracture | 2832.20 | 2832.30 | 0 |
2012-09-01 | Multi-Stage Fracture | 2748.10 | 2748.20 | 0 |
2012-09-01 | Multi-Stage Fracture | 2665.00 | 2665.10 | 0 |
2012-09-01 | Multi-Stage Fracture | 2593.00 | 2593.10 | 0 |
2012-09-01 | Multi-Stage Fracture | 2509.00 | 2509.10 | 0 |
2012-09-01 | Multi-Stage Fracture | 2423.60 | 2423.70 | 0 |
2012-09-01 | Multi-Stage Fracture | 2802.70 | 3802.80 | 0 |
2012-09-01 | Multi-Stage Fracture | 3726.80 | 3726.90 | 0 |
2012-09-01 | Multi-Stage Fracture | 3644.30 | 3644.40 | 0 |
2012-09-01 | Multi-Stage Fracture | 3560.50 | 3560.60 | 0 |
2012-09-01 | Multi-Stage Fracture | 3476.30 | 3476.40 | 0 |
2012-09-01 | Multi-Stage Fracture | 3395.50 | 3395.60 | 0 |
2012-09-01 | Multi-Stage Fracture | 3312.30 | 3312.40 | 0 |
2012-09-01 | Multi-Stage Fracture | 3240.70 | 3240.80 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2156 | 0.0 | 0.0 | 0.0 |
2013 | 8435 | 0.0 | 0.0 | 0.0 |
2014 | 8693 | 0.0 | 0.0 | 0.0 |
2015 | 6767 | 0.0 | 0.0 | 0.0 |
2016 | 8376 | 0.0 | 0.0 | 0.0 |
2017 | 6975 | 0.0 | 0.0 | 0.0 |
2018 | 3769 | 0.0 | 0.0 | 0.0 |
2019 | 6237 | 0.0 | 0.0 | 0.0 |
2020 | 799 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-22 | No Incident Encountered | 0.00 | 0.00 |
2012-09-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]