If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635232512000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.478618,"lon":-117.3276,"icon":""}]} |
Location: 00/12-25-063-23W5/0 | |
Location Alias: 00/12-25-63-23 W5M | |
Location Alias 2: 00/12-25-063-23 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 23 | |
Section: 25 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TANGLE CREEK HZ WAHIGAN 12-25-63-23 | |
Operator Name: Tangle Creek Energy Ltd. | |
License Number: 0442662 | |
License Date: 2012-01-11 | |
License Status: Issued | |
Spud Date: 2012-01-31 | |
Final Drill Date: 2012-02-18 | |
Well Total Depth: 3880.00 m | |
Surface Hole Latitude: 54.478618 | |
Surface Hole Longitude: -117.327600 |
Date | Event |
---|---|
2012-01-11 | Obtained License |
2012-02-01 | Surface Casing Operation Performed |
2012-02-04 | Direction Drilling Operation Performed - Horizontal |
2012-02-11 | Intermediate Casing Operation Performed |
2012-02-12 | Well Log Performed |
2012-02-18 | Finished Drilling |
2012-02-18 | Well Log Performed |
2012-02-18 | Well Mode changed to Drilled and Cased |
2012-02-20 | Liner Casing Operation Performed |
2012-02-22 | Rig Released |
2012-02-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-29 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-05 | Well Began Production |
2012-03-05 | Well Fluid changed to Crude Oil |
2012-03-05 | Well Mode changed to Flowing |
2012-03-16 | Well Fluid changed to Crude Oil |
2012-03-16 | Well Mode changed to Pumping |
2019-05-31 | Well Fluid changed to Crude Oil |
2019-05-31 | Well Mode changed to Gas Lift |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-31 | Beaver Drilling Ltd. | 10 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-04 | 1664.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-29 | Open Hole/Barefoot Completion | 3875.00 | 3880.00 | 0 |
2012-02-29 | Multi-Stage Fracture | 3204.60 | 3204.70 | 0 |
2012-02-29 | Multi-Stage Fracture | 3123.00 | 3123.10 | 0 |
2012-03-02 | Multi-Stage Fracture | 3040.20 | 3040.30 | 0 |
2012-03-02 | Multi-Stage Fracture | 2970.20 | 2970.30 | 0 |
2012-03-02 | Multi-Stage Fracture | 2887.30 | 2887.40 | 0 |
2012-03-02 | Multi-Stage Fracture | 2804.50 | 2804.60 | 0 |
2012-03-02 | Multi-Stage Fracture | 2721.50 | 2721.60 | 0 |
2012-03-02 | Multi-Stage Fracture | 2650.40 | 2650.50 | 0 |
2012-03-02 | Multi-Stage Fracture | 2564.20 | 2564.30 | 0 |
2012-03-02 | Multi-Stage Fracture | 2491.20 | 2491.30 | 0 |
2012-02-29 | Multi-Stage Fracture | 3840.30 | 3840.40 | 0 |
2012-02-29 | Multi-Stage Fracture | 3764.30 | 3764.40 | 0 |
2012-02-29 | Multi-Stage Fracture | 3681.20 | 3681.30 | 0 |
2012-02-29 | Multi-Stage Fracture | 3600.20 | 3600.30 | 0 |
2012-02-29 | Multi-Stage Fracture | 3518.70 | 3518.80 | 0 |
2012-02-29 | Multi-Stage Fracture | 3437.40 | 3437.50 | 0 |
2012-02-29 | Multi-Stage Fracture | 3369.30 | 3369.40 | 0 |
2012-02-29 | Multi-Stage Fracture | 3286.40 | 3286.50 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 5897 | 0.0 | 0.0 | 0.0 |
2013 | 8506 | 0.0 | 0.0 | 0.0 |
2014 | 8309 | 0.0 | 0.0 | 0.0 |
2015 | 7063 | 0.0 | 0.0 | 0.0 |
2016 | 7729 | 0.0 | 0.0 | 0.0 |
2017 | 6945 | 0.0 | 0.0 | 0.0 |
2018 | 1888 | 0.0 | 0.0 | 0.0 |
2019 | 2033 | 0.0 | 0.0 | 0.0 |
2020 | 1030 | 0.0 | 0.0 | 0.0 |
For data sources see[7]