X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635232513003

Well Details

Well ID: 0635232513003
Loading map...
Location: 00/13-25-063-23W5/3
Location Alias: 00/13-25-63-23 W5M
Location Alias 2: 00/13-25-063-23 W5/03
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 23
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: TANGLE CREEK HZ WAHIGAN 16-25-63-23
Operator Name: Tangle Creek Energy Ltd.
License Number: 0438443
License Date: 2011-11-03
License Status: Amended
Spud Date: 2011-12-29
Final Drill Date: 2012-01-23
Well Total Depth: 3688.00 m
Surface Hole Latitude: 54.486667
Surface Hole Longitude: -117.328439

For data sources see[1][2]

Well History

Date Event
2011-11-03 Obtained License
2011-12-30 Surface Casing Operation Performed
2012-01-02 Direction Drilling Operation Performed - Horizontal
2012-01-07 Intermediate Casing Operation Performed
2012-01-09 Direction Drilling Operation Performed - Horizontal
2012-01-19 Direction Drilling Operation Performed - Horizontal
2012-01-23 Finished Drilling
2012-01-23 Well Log Performed
2012-01-23 Well Mode changed to Drilled and Cased
2012-01-27 Liner Casing Operation Performed
2012-01-28 Rig Released
2012-02-03 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-03 Perforation Treatment Performed - Open-Hole Completion
2012-02-05 Well Began Production
2012-02-05 Well Fluid changed to Crude Oil
2012-02-05 Well Mode changed to Flowing
2012-03-17 Well Fluid changed to Crude Oil
2012-03-17 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-01-02 1809.00 Horizontal
2012-01-09 2420.00 Horizontal
2012-01-19 2826.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-03 Open Hole/Barefoot Completion 3683.00 3688.00 0
2012-02-03 Multi-Stage Fracture 3094.10 3094.20 0
2012-02-03 Multi-Stage Fracture 3025.20 3025.30 0
2012-02-03 Multi-Stage Fracture 2954.40 2954.50 0
2012-02-03 Multi-Stage Fracture 2884.30 2884.40 0
2012-02-03 Multi-Stage Fracture 2769.10 2769.20 0
2012-02-03 Multi-Stage Fracture 2698.60 2698.70 0
2012-02-03 Multi-Stage Fracture 2627.80 2627.90 0
2012-02-03 Multi-Stage Fracture 2544.30 2544.40 0
2012-02-03 Multi-Stage Fracture 2475.60 2475.70 0
2012-02-03 Multi-Stage Fracture 2388.30 2388.40 0
2012-02-03 Multi-Stage Fracture 3648.30 3648.40 0
2012-02-03 Multi-Stage Fracture 3583.90 3584.00 0
2012-02-03 Multi-Stage Fracture 3515.30 3515.40 0
2012-02-03 Multi-Stage Fracture 3445.30 3445.40 0
2012-02-03 Multi-Stage Fracture 3376.50 3376.60 0
2012-02-03 Multi-Stage Fracture 3307.10 3307.20 0
2012-02-03 Multi-Stage Fracture 3235.90 3236.00 0
2012-02-03 Multi-Stage Fracture 3165.10 3165.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6759 0.0 0.0 0.0
2013 8509 0.0 0.0 0.0
2014 8345 0.0 0.0 0.0
2015 7756 0.0 0.0 0.0
2016 8275 0.0 0.0 0.0
2017 8249 0.0 0.0 0.0
2018 4404 0.0 0.0 0.0
2019 6231 0.0 0.0 0.0
2020 585 0.0 0.0 0.0

For data sources see[6]

References