If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635233609000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.496118,"lon":-117.357176,"icon":""}]} |
Location: 00/09-36-063-23W5/0 | |
Location Alias: 00/09-36-63-23 W5M | |
Location Alias 2: 00/09-36-063-23 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 23 | |
Section: 36 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TANGLE CREEK HZ WAHIGAN 9-36-63-23 | |
Operator Name: Tangle Creek Energy Ltd. | |
License Number: 0438104 | |
License Date: 2011-10-27 | |
License Status: Issued | |
Spud Date: 2012-02-01 | |
Final Drill Date: 2012-02-14 | |
Well Total Depth: 3709.00 m | |
Surface Hole Latitude: 54.496118 | |
Surface Hole Longitude: -117.357176 |
Date | Event |
---|---|
2011-10-27 | Obtained License |
2012-02-02 | Surface Casing Operation Performed |
2012-02-05 | Direction Drilling Operation Performed - Horizontal |
2012-02-09 | Intermediate Casing Operation Performed |
2012-02-10 | Well Log Performed |
2012-02-14 | Finished Drilling |
2012-02-14 | Well Mode changed to Drilled and Cased |
2012-02-15 | Well Log Performed |
2012-02-16 | Liner Casing Operation Performed |
2012-02-17 | Rig Released |
2012-02-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-20 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-01 | Well Began Production |
2012-03-01 | Well Fluid changed to Crude Oil |
2012-03-01 | Well Mode changed to Flowing |
2012-08-11 | Well Fluid changed to Crude Oil |
2012-08-11 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-01 | Beaver Drilling Ltd. | 01 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-05 | 1803.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-20 | Open Hole/Barefoot Completion | 3700.00 | 3709.00 | 0 |
2012-02-20 | Multi-Stage Fracture | 3038.30 | 3083.40 | 0 |
2012-02-20 | Multi-Stage Fracture | 2956.50 | 2956.60 | 0 |
2012-02-20 | Multi-Stage Fracture | 2886.70 | 2886.80 | 0 |
2012-02-20 | Multi-Stage Fracture | 2803.20 | 2803.30 | 0 |
2012-02-20 | Multi-Stage Fracture | 2721.70 | 2721.80 | 0 |
2012-02-20 | Multi-Stage Fracture | 2655.10 | 2655.20 | 0 |
2012-02-20 | Multi-Stage Fracture | 2573.90 | 2574.00 | 0 |
2012-02-20 | Multi-Stage Fracture | 2491.40 | 2491.50 | 0 |
2012-02-20 | Multi-Stage Fracture | 2420.60 | 2420.70 | 0 |
2012-02-20 | Multi-Stage Fracture | 2338.90 | 2339.00 | 0 |
2012-02-20 | Multi-Stage Fracture | 3662.60 | 3662.70 | 0 |
2012-02-20 | Multi-Stage Fracture | 3585.30 | 3585.40 | 0 |
2012-02-20 | Multi-Stage Fracture | 3503.30 | 3503.40 | 0 |
2012-02-20 | Multi-Stage Fracture | 3434.30 | 3434.40 | 0 |
2012-02-20 | Multi-Stage Fracture | 3351.50 | 3351.60 | 0 |
2012-02-20 | Multi-Stage Fracture | 3269.50 | 3269.60 | 0 |
2012-02-20 | Multi-Stage Fracture | 3202.10 | 3202.20 | 0 |
2012-02-20 | Multi-Stage Fracture | 3120.20 | 3120.30 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6442 | 0.0 | 0.0 | 0.0 |
2013 | 8022 | 0.0 | 0.0 | 0.0 |
2014 | 8317 | 0.0 | 0.0 | 0.0 |
2015 | 8029 | 0.0 | 0.0 | 0.0 |
2016 | 8513 | 0.0 | 0.0 | 0.0 |
2017 | 8110 | 0.0 | 0.0 | 0.0 |
2018 | 3680 | 0.0 | 0.0 | 0.0 |
2019 | 5595 | 0.0 | 0.0 | 0.0 |
2020 | 341 | 0.0 | 0.0 | 0.0 |
For data sources see[7]