X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0636010215002

Well Details

Well ID: 0636010215002
Loading map...
Location: 00/15-02-063-01W6/2
Location Alias: 00/15-02-63-01 W6M
Location Alias 2: 00/15-02-063-01 W6/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 6
Range: 01
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: RIDGEBACK LATORNLL 14-1-63-1
Operator Name: Cequence Energy Ltd.
License Number: 0432371
License Date: 2011-03-15
License Status: Suspension
Spud Date: 2011-08-01
Final Drill Date: 2011-09-09
Well Total Depth: 4300.00 m
Surface Hole Latitude: 54.424623
Surface Hole Longitude: -118.011330

For data sources see[1][2]

Well History

Date Event
2011-03-15 Obtained License
2011-08-04 Surface Casing Operation Performed
2011-08-11 Direction Drilling Operation Performed - Horizontal
2011-08-29 Well Log Performed
2011-08-30 Intermediate Casing Operation Performed
2011-09-09 Finished Drilling
2011-09-09 Well Log Performed
2011-09-09 Well Mode changed to Drilled and Cased
2011-09-11 Well Log Performed
2011-09-15 Perforation Treatment Performed - Open-Hole Completion
2011-09-15 Production Casing Operation Performed
2011-09-18 Rig Released
2011-10-03 Well Log Performed
2011-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-03 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-04 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-06 Well Began Production
2011-11-06 Well Fluid changed to Crude Oil
2011-11-06 Well Mode changed to Flowing
2017-10-01 Well Fluid changed to Crude Oil
2017-10-01 Well Mode changed to Suspended
2020-01-05 Well Log Performed
2020-01-10 Well Log Performed
2020-02-01 Well Began Injection
2020-02-01 Well Fluid changed to Water
2020-02-01 Well Type changed to Disposal

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-11 2406.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-15 Open Hole/Barefoot Completion 4210.00 4300.00 0
2011-11-03 Multi-Stage Fracture 3597.70 3597.80 0
2011-11-03 Multi-Stage Fracture 3518.70 3518.80 0
2011-11-04 Multi-Stage Fracture 3453.50 3453.60 0
2011-11-04 Multi-Stage Fracture 3374.40 3374.50 0
2011-11-04 Multi-Stage Fracture 3295.10 3295.20 0
2011-11-04 Multi-Stage Fracture 3202.30 3202.40 0
2011-10-28 Multi-Stage Fracture 4181.30 4181.40 0
2011-10-28 Multi-Stage Fracture 4116.40 4116.50 0
2011-10-28 Multi-Stage Fracture 4014.40 4014.50 0
2011-10-29 Multi-Stage Fracture 3920.70 3920.80 0
2011-10-29 Multi-Stage Fracture 3856.60 3856.70 0
2011-10-29 Multi-Stage Fracture 3791.90 3792.00 0
2011-11-03 Multi-Stage Fracture 3712.50 3712.60 0
2011-11-03 Multi-Stage Fracture 3661.80 3661.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1063 0.0 0.0 0.0
2012 8173 0.0 0.0 0.0
2013 8231 0.0 0.0 0.0
2014 6983 0.0 0.0 0.0
2015 4372 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References