If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0636010215002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.424623,"lon":-118.01133,"icon":""}]} |
Location: 00/15-02-063-01W6/2 | |
Location Alias: 00/15-02-63-01 W6M | |
Location Alias 2: 00/15-02-063-01 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 6 | |
Range: 01 | |
Section: 02 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: RIDGEBACK LATORNLL 14-1-63-1 | |
Operator Name: Cequence Energy Ltd. | |
License Number: 0432371 | |
License Date: 2011-03-15 | |
License Status: Suspension | |
Spud Date: 2011-08-01 | |
Final Drill Date: 2011-09-09 | |
Well Total Depth: 4300.00 m | |
Surface Hole Latitude: 54.424623 | |
Surface Hole Longitude: -118.011330 |
Date | Event |
---|---|
2011-03-15 | Obtained License |
2011-08-04 | Surface Casing Operation Performed |
2011-08-11 | Direction Drilling Operation Performed - Horizontal |
2011-08-29 | Well Log Performed |
2011-08-30 | Intermediate Casing Operation Performed |
2011-09-09 | Finished Drilling |
2011-09-09 | Well Log Performed |
2011-09-09 | Well Mode changed to Drilled and Cased |
2011-09-11 | Well Log Performed |
2011-09-15 | Perforation Treatment Performed - Open-Hole Completion |
2011-09-15 | Production Casing Operation Performed |
2011-09-18 | Rig Released |
2011-10-03 | Well Log Performed |
2011-10-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-06 | Well Began Production |
2011-11-06 | Well Fluid changed to Crude Oil |
2011-11-06 | Well Mode changed to Flowing |
2017-10-01 | Well Fluid changed to Crude Oil |
2017-10-01 | Well Mode changed to Suspended |
2020-01-05 | Well Log Performed |
2020-01-10 | Well Log Performed |
2020-02-01 | Well Began Injection |
2020-02-01 | Well Fluid changed to Water |
2020-02-01 | Well Type changed to Disposal |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-11 | 2406.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-15 | Open Hole/Barefoot Completion | 4210.00 | 4300.00 | 0 |
2011-11-03 | Multi-Stage Fracture | 3597.70 | 3597.80 | 0 |
2011-11-03 | Multi-Stage Fracture | 3518.70 | 3518.80 | 0 |
2011-11-04 | Multi-Stage Fracture | 3453.50 | 3453.60 | 0 |
2011-11-04 | Multi-Stage Fracture | 3374.40 | 3374.50 | 0 |
2011-11-04 | Multi-Stage Fracture | 3295.10 | 3295.20 | 0 |
2011-11-04 | Multi-Stage Fracture | 3202.30 | 3202.40 | 0 |
2011-10-28 | Multi-Stage Fracture | 4181.30 | 4181.40 | 0 |
2011-10-28 | Multi-Stage Fracture | 4116.40 | 4116.50 | 0 |
2011-10-28 | Multi-Stage Fracture | 4014.40 | 4014.50 | 0 |
2011-10-29 | Multi-Stage Fracture | 3920.70 | 3920.80 | 0 |
2011-10-29 | Multi-Stage Fracture | 3856.60 | 3856.70 | 0 |
2011-10-29 | Multi-Stage Fracture | 3791.90 | 3792.00 | 0 |
2011-11-03 | Multi-Stage Fracture | 3712.50 | 3712.60 | 0 |
2011-11-03 | Multi-Stage Fracture | 3661.80 | 3661.90 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1063 | 0.0 | 0.0 | 0.0 |
2012 | 8173 | 0.0 | 0.0 | 0.0 |
2013 | 8231 | 0.0 | 0.0 | 0.0 |
2014 | 6983 | 0.0 | 0.0 | 0.0 |
2015 | 4372 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]