X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0636021013002

Well Details

Well ID: 0636021013002
Loading map...
Location: 00/13-10-063-02W6/2
Location Alias: 00/13-10-63-02 W6M
Location Alias 2: 00/13-10-063-02 W6/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 6
Range: 02
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ KARR 13-10-63-2
Operator Name: XTO Energy Canada ULC
License Number: 0436737
License Date: 2011-09-12
License Status: Amended
Spud Date: 2011-10-07
Final Drill Date: 2011-11-17
Well Total Depth: 4218.00 m
Surface Hole Latitude: 54.430840
Surface Hole Longitude: -118.220934

For data sources see[1][2]

Well History

Date Event
2011-09-12 Obtained License
2011-10-14 Surface Casing Operation Performed
2011-11-05 Direction Drilling Operation Performed - Horizontal
2011-11-10 Production Casing Operation Performed
2011-11-17 Finished Drilling
2011-11-17 Well Log Performed
2011-11-17 Well Mode changed to Drilled and Cased
2011-11-22 Liner Casing Operation Performed
2011-11-22 Perforation Treatment Performed - Open-Hole Completion
2011-11-24 Rig Released
2011-11-24 Well Log Performed
2012-01-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-07 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-08 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-09 Well Fluid changed to Gas
2012-01-09 Well Mode changed to Testing
2012-04-01 Well Fluid changed to Gas
2012-04-01 Well Mode changed to Test Completed
2012-07-01 Well Fluid changed to Gas
2012-07-01 Well Mode changed to Testing
2012-09-01 Well Began Production
2012-09-01 Well Fluid changed to Gas
2012-09-01 Well Mode changed to Flowing
2014-09-01 Well Fluid changed to Gas
2014-09-01 Well Mode changed to Suspended
2015-07-01 Well Fluid changed to Gas
2015-07-01 Well Mode changed to Flowing
2020-03-01 Well Fluid changed to Gas
2020-03-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-05 2772.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-22 Open Hole/Barefoot Completion 4211.00 4218.00 0
2012-01-08 Multi-Stage Fracture 3497.30 3498.90 0
2012-01-08 Multi-Stage Fracture 3397.70 3399.30 0
2012-01-08 Multi-Stage Fracture 3297.70 3299.40 0
2012-01-09 Multi-Stage Fracture 3200.10 3201.70 0
2012-01-09 Multi-Stage Fracture 3115.10 3116.80 0
2012-01-09 Multi-Stage Fracture 3013.80 3015.50 0
2012-01-09 Multi-Stage Fracture 2952.40 2954.10 0
2012-01-06 Multi-Stage Fracture 4201.10 4202.40 0
2012-01-06 Multi-Stage Fracture 4134.30 4136.00 0
2012-01-07 Multi-Stage Fracture 4046.20 4047.80 0
2012-01-07 Multi-Stage Fracture 3947.50 3949.10 0
2012-01-07 Multi-Stage Fracture 3862.30 3864.00 0
2012-01-07 Multi-Stage Fracture 3776.10 3777.80 0
2012-01-07 Multi-Stage Fracture 3677.70 3679.30 0
2012-01-08 Multi-Stage Fracture 3584.00 3585.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2373 0.0 0.0 0.0
2013 4007 0.0 0.0 0.0
2015 48 0.0 0.0 0.0
2016 1656 0.0 0.0 0.0
2017 3191 0.0 0.0 0.0
2018 1994 0.0 0.0 0.0
2019 531 0.0 0.0 0.0
2020 662 0.0 0.0 0.0

For data sources see[6]

References