If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0636043002000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.474411,"lon":-118.58948,"icon":""}]} |
Location: 00/02-30-063-04W6/0 | |
Location Alias: 00/02-30-63-04 W6M | |
Location Alias 2: 00/02-30-063-04 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 6 | |
Range: 04 | |
Section: 30 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CANOR MUSREAU LAKE 2-30-63-4 | |
Operator Name: Enerplus Corporation | |
License Number: 0012924 | |
License Date: 1957-01-14 | |
License Status: RecCertified | |
Spud Date: 1957-01-28 | |
Final Drill Date: 1957-03-15 | |
Well Total Depth: 2251.30 m | |
Surface Hole Latitude: 54.474411 | |
Surface Hole Longitude: -118.589480 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1957-01-14 | Obtained License |
1957-01-28 | Lost Circulation Occurred |
1957-02-12 | Drill Stem Test Performed |
1957-02-28 | Drill Stem Test Performed |
1957-03-15 | Finished Drilling |
1957-03-18 | Production Casing Operation Performed |
1957-04-18 | Well Mode changed to Drilled and Cased |
1958-01-24 | Perforation Treatment Performed - Jet Perforation |
1958-01-24 | Well Log Performed |
1958-01-26 | Perforation Treatment Performed - Fractured |
1958-02-07 | Perforation Treatment Performed - Fractured |
1958-02-11 | Perforation Treatment Performed - Jet Perforation |
1958-02-12 | Perforation Treatment Performed - Fractured |
1987-12-13 | Well Began Production |
1987-12-13 | Well Fluid changed to Crude Oil |
1987-12-13 | Well Mode changed to Pumping |
1992-06-30 | Well Fluid changed to Crude Oil |
1992-06-30 | Well Mode changed to Suspended |
1994-01-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-01-09 | Perforation Treatment Performed - Jet Perforation |
1994-01-09 | Plug Back Performed |
1994-01-12 | Perforation Treatment Performed - Remedial Casing |
1994-01-12 | Well Fluid changed to Crude Oil |
1994-01-12 | Well Mode changed to Abandoned |
1994-01-13 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1958-01-24 | Perforation | 1738.00 | 1754.10 | 13 |
1958-01-26 | Fracture | 1738.00 | 1754.10 | 0 |
1958-02-07 | Fracture | 1738.00 | 1754.10 | 0 |
1958-02-11 | Perforation | 1730.70 | 1734.30 | 13 |
1958-02-12 | Fracture | 1730.70 | 1734.30 | 0 |
1994-01-09 | Packing Device Capped w/Cement | 1700.00 | 1708.00 | 0 |
1994-01-09 | Packing Device Capped w/Cement | 547.00 | 555.00 | 0 |
1994-01-09 | Perforation | 356.00 | 357.00 | 13 |
1994-01-12 | Remedial Casing Cementing | 356.00 | 357.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1964 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 356 | 0.0 | 0.0 | 0.0 |
1988 | 1009 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1957-01-28 | Lost Circulation | 0.10 | 179.80 |
For data sources see[6]