If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0636043413000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.487236,"lon":-118.524154,"icon":""}]} |
| Location: 00/13-34-063-04W6/0 | |
| Location Alias: 00/13-34-63-04 W6M | |
| Location Alias 2: 00/13-34-063-04 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 063 | |
| Meridian: 6 | |
| Range: 04 | |
| Section: 34 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: HARVEST HZ KAKWA 13-34-63-4 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0435806 | |
| License Date: 2011-08-08 | |
| License Status: Suspension | |
| Spud Date: 2011-08-23 | |
| Final Drill Date: 2011-09-15 | |
| Well Total Depth: 3892.00 m | |
| Surface Hole Latitude: 54.487236 | |
| Surface Hole Longitude: -118.524154 |
| Date | Event |
|---|---|
| 2011-08-08 | Obtained License |
| 2011-08-26 | Surface Casing Operation Performed |
| 2011-08-31 | Well Log Performed |
| 2011-09-01 | Direction Drilling Operation Performed - Deviate |
| 2011-09-06 | Direction Drilling Operation Performed - Horizontal |
| 2011-09-09 | Intermediate Casing Operation Performed |
| 2011-09-15 | Finished Drilling |
| 2011-09-15 | Well Mode changed to Drilled and Cased |
| 2011-09-17 | Well Log Performed |
| 2011-09-18 | Perforation Treatment Performed - Jet Perforation |
| 2011-09-18 | Well Log Performed |
| 2011-09-21 | Liner Casing Operation Performed |
| 2011-09-21 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-09-22 | Rig Released |
| 2012-02-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-02-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-03-01 | Well Began Production |
| 2012-03-01 | Well Fluid changed to Gas |
| 2012-03-01 | Well Mode changed to Flowing |
| 2016-07-01 | Well Fluid changed to Gas |
| 2016-07-01 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-09-01 | 2165.70 | Deviate (5 - 79 degrees) |
| 2011-09-06 | 2641.30 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-09-18 | Perforation | 2630.00 | 2631.00 | 21 |
| 2012-02-16 | Multi-Stage Fracture | 3342.60 | 3342.70 | 0 |
| 2012-02-16 | Multi-Stage Fracture | 3268.30 | 3268.40 | 0 |
| 2012-02-16 | Multi-Stage Fracture | 3194.20 | 3194.30 | 0 |
| 2012-02-17 | Multi-Stage Fracture | 3116.30 | 3116.40 | 0 |
| 2012-02-17 | Multi-Stage Fracture | 3042.00 | 3042.10 | 0 |
| 2012-02-17 | Multi-Stage Fracture | 2968.10 | 2968.20 | 0 |
| 2012-02-17 | Multi-Stage Fracture | 2901.60 | 2901.70 | 0 |
| 2012-02-17 | Multi-Stage Fracture | 2827.10 | 2827.20 | 0 |
| 2012-02-17 | Multi-Stage Fracture | 2752.70 | 2752.80 | 0 |
| 2012-02-17 | Multi-Stage Fracture | 2633.60 | 2633.70 | 0 |
| 2011-09-21 | Open Hole/Barefoot Completion | 3887.00 | 3892.00 | 0 |
| 2012-02-16 | Multi-Stage Fracture | 3866.10 | 3866.20 | 0 |
| 2012-02-16 | Multi-Stage Fracture | 3795.90 | 3796.00 | 0 |
| 2012-02-16 | Multi-Stage Fracture | 3721.40 | 3721.50 | 0 |
| 2012-02-16 | Multi-Stage Fracture | 3646.90 | 3647.00 | 0 |
| 2012-02-16 | Multi-Stage Fracture | 3569.30 | 3569.40 | 0 |
| 2012-02-16 | Multi-Stage Fracture | 3494.80 | 3494.90 | 0 |
| 2012-02-16 | Multi-Stage Fracture | 3420.50 | 3420.60 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 6595 | 0.0 | 0.0 | 0.0 |
| 2013 | 1 | 0.0 | 0.0 | 0.0 |
| 2014 | 5136 | 0.0 | 0.0 | 0.0 |
| 2015 | 7480 | 0.0 | 0.0 | 0.0 |
For data sources see[6]