X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0636060214000

Well Details

Well ID: 0636060214000
Loading map...
Location: 00/14-02-063-06W6/0
Location Alias: 00/14-02-63-06 W6M
Location Alias 2: 00/14-02-063-06 W6/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 6
Range: 06
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: HARVEST HZ KAKWA 14-2-63-6
Operator Name: Harvest Operations Corp.
License Number: 0453624
License Date: 2013-01-15
License Status: Suspension
Spud Date: 2013-02-13
Final Drill Date: 2013-03-27
Well Total Depth: 5137.00 m
Surface Hole Latitude: 54.411832
Surface Hole Longitude: -118.796460

For data sources see[1][2]

Well History

Date Event
2013-01-15 Obtained License
2013-02-13 Lost Circulation Occurred
2013-02-16 Surface Casing Operation Performed
2013-03-03 Direction Drilling Operation Performed - Deviate
2013-03-12 Direction Drilling Operation Performed - Horizontal
2013-03-13 Intermediate Casing Operation Performed
2013-03-13 Well Log Performed
2013-03-17 Well Log Performed
2013-03-27 Finished Drilling
2013-03-27 Well Log Performed
2013-03-27 Well Mode changed to Drilled and Cased
2013-03-28 Well Log Performed
2013-03-29 Liner Casing Operation Performed
2013-03-29 Perforation Treatment Performed - Open-Hole Completion
2013-03-29 Well Log Performed
2013-03-31 Rig Released
2013-07-10 Perforation Treatment Performed - Multi-Stage Fracture
2013-07-11 Perforation Treatment Performed - Multi-Stage Fracture
2013-07-12 Perforation Treatment Performed - Multi-Stage Fracture
2013-09-12 Well Began Production
2013-09-12 Well Fluid changed to Gas
2013-09-12 Well Mode changed to Flowing
2014-05-09 Well Fluid changed to Gas
2014-05-09 Well Mode changed to Pumping
2016-07-01 Well Fluid changed to Gas
2016-07-01 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-02-13 Precision Drilling Corporation 632 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-03-03 3259.00 Deviate (5 - 79 degrees)
2013-03-12 3636.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-03-29 Open Hole/Barefoot Completion 5127.00 5137.00 0
2013-07-11 Multi-Stage Fracture 4438.90 4441.70 0
2013-07-11 Multi-Stage Fracture 4342.30 4345.10 0
2013-07-12 Multi-Stage Fracture 4258.50 4261.30 0
2013-07-12 Multi-Stage Fracture 4161.80 4184.60 0
2013-07-12 Multi-Stage Fracture 4079.00 4081.80 0
2013-07-12 Multi-Stage Fracture 3996.10 3998.90 0
2013-07-12 Multi-Stage Fracture 3913.70 3916.50 0
2013-07-12 Multi-Stage Fracture 3855.00 3857.80 0
2013-07-10 Multi-Stage Fracture 5101.00 5106.00 0
2013-07-10 Multi-Stage Fracture 5054.00 5056.80 0
2013-07-10 Multi-Stage Fracture 4970.10 4972.90 0
2013-07-11 Multi-Stage Fracture 4874.60 4877.40 0
2013-07-11 Multi-Stage Fracture 4792.30 4795.10 0
2013-07-11 Multi-Stage Fracture 4698.40 4701.20 0
2013-07-11 Multi-Stage Fracture 4616.10 4618.90 0
2013-07-11 Multi-Stage Fracture 4533.70 4536.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-07-10 2013-07-12 3,527 2,394 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 48.092 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 16.7571 N/A
40/80 Hydroprop Calfrac Mullite 1302-93-8 100 4.8425 N/A
Silica Crystalline-Cristobalite 14464-46-1 100 4.8425 N/A
Silicon Dioxide. (amorphous as glass) 7631-86-9 100 4.8425 N/A
DWP-412 Calfrac Activator Non-Hazardous Ingredients Trade Secret 100 0.4247 N/A
DWP-966 Calfrac Bactericide/Biocide Bronopol 52-51-7 100 0.0322 N/A
Methanol 67-56-1 100 0.0314 N/A
Water 7732-18-5 100 0.0314 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0573 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 28.6318 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0167 N/A
DWP-421 Calfrac Surfactant 2-Propanol 67-63-0 100 1.1475 N/A
Fatty amine I 8725 100 1.1471 N/A
Fatty amine II 8725 100 1.1471 N/A
Non-Hazardous Ingredients Trade Secret 100 1.1475 N/A
Water 7732-18-5 100 1.1475 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-06-25 2013-07-08 Groundwater - Non-saline less than or equal to 150m deep 2886

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 367 0.0 0.0 0.0
2014 3837 0.0 0.0 0.0
2015 3169 0.0 0.0 0.0
2016 49 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-13 Lost Circulation 166.00 166.00
2013-07-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References