X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0636082406020

Well Details

Well ID: 0636082406020
Loading map...
Location: 02/06-24-063-08W6/0
Location Alias: 02/06-24-63-08 W6M
Location Alias 2: 02/06-24-063-08 W6/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 6
Range: 08
Section: 24
County/Municipality: Municipal District of Greenview No. 16
Well Name: HARVEST REDROCK 6-24-63-8
Operator Name: Harvest Operations Corp.
License Number: 0260860
License Date: 2001-10-22
License Status: Issued
Spud Date: 2001-10-30
Final Drill Date: 2001-12-17
Well Total Depth: 3303.00 m
Surface Hole Latitude: 54.461575
Surface Hole Longitude: -119.071798

For data sources see[1][2]

Well History

Date Event
2001-10-22 Obtained License
2001-10-30 Lost Circulation Occurred
2001-11-01 Lost Circulation Occurred
2001-11-11 Surface Casing Operation Performed
2001-11-25 Direction Drilling Operation Performed - Deviate
2001-12-17 Finished Drilling
2001-12-17 Well Log Performed
2001-12-19 Production Casing Operation Performed
2001-12-20 Rig Released
2001-12-20 Well Mode changed to Drilled and Cased
2001-12-31 Well Log Performed
2002-01-14 Well Log Performed
2002-01-15 Perforation Treatment Performed - Jet Perforation
2002-01-15 Well Log Performed
2002-01-17 Perforation Treatment Performed - Fractured
2002-03-22 Well Began Production
2002-03-22 Well Fluid changed to Gas
2002-03-22 Well Mode changed to Flowing
2011-01-28 Well Fluid changed to Gas
2011-01-28 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-11-25 2341.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-01-15 Perforation 2887.00 2891.00 17
2002-01-17 Fracture 2887.00 2891.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 3209 0.0 0.0 0.0
2003 7514 0.0 0.0 0.0
2004 8553 0.0 0.0 0.0
2005 8578 0.0 0.0 0.0
2006 8375 0.0 0.0 0.0
2007 8663 0.0 0.0 0.0
2008 8774 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8677 0.0 0.0 0.0
2011 8438 0.0 0.0 0.0
2012 8643 0.0 0.0 0.0
2013 8569 0.0 0.0 0.0
2014 8074 0.0 0.0 0.0
2015 8454 0.0 0.0 0.0
2016 8748 0.0 0.0 0.0
2017 8620 0.0 0.0 0.0
2018 7992 0.0 0.0 0.0
2019 2658 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2001-10-30 Lost Circulation 40.00 40.00
2001-11-01 Lost Circulation 82.00 550.00

For data sources see[7]

References