X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644131912006

Well Details

Well ID: 0644131912006
Loading map...
Location: 00/12-19-064-13W4/6
Location Alias: 00/12-19-64-13 W4M
Location Alias 2: 00/12-19-064-13 W4/06
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 13
Section: 19
County/Municipality: Lac La Biche County
Well Name: SOC CRAIGND 12-19-64-13
Operator Name: AlphaBow Energy Ltd.
License Number: 0181754
License Date: 1995-11-01
License Status: Issued
Spud Date: 1995-11-02
Final Drill Date: 1995-11-04
Well Total Depth: 490.00 m
Surface Hole Latitude: 54.551123
Surface Hole Longitude: -111.968811

For data sources see[1][2]

Well History

Date Event
1995-11-01 Obtained License
1995-11-03 Surface Casing Operation Performed
1995-11-04 Finished Drilling
1995-11-04 Production Casing Operation Performed
1995-11-04 Rig Released
1995-11-04 Well Log Performed
1995-11-04 Well Mode changed to Drilled and Cased
1995-11-09 Perforation Treatment Performed - Open-Hole Completion
1997-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-09 Perforation Treatment Performed - Jet Perforation
1997-09-09 Plug Back Performed
1999-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-01-16 Perforation Treatment Performed - Jet Perforation
1999-01-16 Plug Back Performed
2003-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-20 Perforation Treatment Performed - Jet Perforation
2003-02-20 Plug Back Performed
2003-02-21 Perforation Treatment Performed - Jet Perforation
2003-02-21 Well Log Performed
2003-02-23 Perforation Treatment Performed - Fractured
2011-04-26 Well Began Production
2011-04-26 Well Fluid changed to Gas
2011-04-26 Well Log Performed
2011-04-26 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-11-09 Open Hole/Barefoot Completion 484.00 490.00 0
2003-02-20 Perforation 358.00 359.00 17
2003-02-21 Perforation 326.00 329.00 17
2003-02-21 Perforation 323.00 325.00 17
2003-02-23 Fracture 323.00 329.00 0
1997-09-09 Packing Device Capped w/Cement 474.00 482.00 0
1997-09-09 Perforation 416.00 417.00 13
1997-09-09 Perforation 418.00 420.00 13
1997-09-09 Perforation 401.50 402.00 13
1999-01-16 Packing Device Capped w/Cement 407.00 415.00 0
1999-01-16 Perforation 401.50 402.50 13
2003-02-20 Packing Device Capped w/Cement 385.00 393.00 0
2003-02-20 Perforation 366.00 367.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5875 0.0 0.0 0.0
2012 8756 0.0 0.0 0.0
2013 8733 0.0 0.0 0.0
2014 8744 0.0 0.0 0.0
2015 8746 0.0 0.0 0.0
2016 8770 0.0 0.0 0.0
2017 8707 0.0 0.0 0.0
2018 5411 0.0 0.0 0.0
2019 6432 0.0 0.0 0.0
2020 2081 0.0 0.0 0.0

For data sources see[5]

References