X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644140315002

Well Details

Well ID: 0644140315002
Loading map...
Location: 00/15-03-064-14W4/2
Location Alias: 00/15-03-64-14 W4M
Location Alias 2: 00/15-03-064-14 W4/02
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 14
Section: 03
County/Municipality: Lac La Biche County
Well Name: SOC CRAIGND 15-3-64-14
Operator Name: AlphaBow Energy Ltd.
License Number: 0193117
License Date: 1996-11-05
License Status: Issued
Spud Date: 1996-12-05
Final Drill Date: 1996-12-07
Well Total Depth: 523.70 m
Surface Hole Latitude: 54.512201
Surface Hole Longitude: -112.029252

For data sources see[1][2]

Well History

Date Event
1996-11-05 Obtained License
1996-12-06 Surface Casing Operation Performed
1996-12-07 Finished Drilling
1996-12-07 Production Casing Operation Performed
1996-12-07 Well Log Performed
1996-12-07 Well Mode changed to Drilled and Cased
1996-12-08 Rig Released
1996-12-12 Perforation Treatment Performed - Open-Hole Completion
1997-09-10 Perforation Treatment Performed - Open-Hole Completion
1997-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-06 Perforation Treatment Performed - Open-Hole Completion
1998-02-07 Perforation Treatment Performed - Cement Squeeze
1998-02-09 Perforation Treatment Performed - Cement Squeeze
1998-02-09 Perforation Treatment Performed - Jet Perforation
1998-02-11 Perforation Treatment Performed - Jet Perforation
1998-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-12 Perforation Treatment Performed - Jet Perforation
1998-02-13 Well Began Production
1998-02-13 Well Fluid changed to Gas
1998-02-13 Well Mode changed to Flowing
2001-01-01 Well Fluid changed to Gas
2001-01-01 Well Mode changed to Pumping
2018-12-01 Well Fluid changed to Gas
2018-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-12-12 Open Hole/Barefoot Completion 505.00 514.00 0
1998-02-12 Packing Device Capped w/Cement 479.00 495.00 0
1998-02-12 Perforation 468.50 470.00 13
1998-02-12 Perforation 447.50 449.00 13
1997-09-10 Open Hole/Barefoot Completion 514.00 515.00 0
1997-09-11 Acid Treatment 514.00 515.00 0
1998-02-06 Open Hole/Barefoot Completion 515.00 523.70 0
1998-02-07 Cement Squeeze 514.00 523.70 0
1998-02-09 Perforation 506.00 506.50 13
1998-02-09 Cement Squeeze 506.00 506.50 0
1998-02-11 Perforation 515.00 518.00 13
1998-02-12 Perforation 496.50 497.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 7718 0.0 0.0 0.0
1999 8749 0.0 0.0 0.0
2000 8773 0.0 0.0 0.0
2001 5051 0.0 0.0 0.0
2002 8613 0.0 0.0 0.0
2003 8581 0.0 0.0 0.0
2004 8201 0.0 0.0 0.0
2005 7567 0.0 0.0 0.0
2006 8572 0.0 0.0 0.0
2007 8757 0.0 0.0 0.0
2008 8406 0.0 0.0 0.0
2009 8569 0.0 0.0 0.0
2010 7772 0.0 0.0 0.0
2011 8532 0.0 0.0 0.0
2012 7847 0.0 0.0 0.0
2013 7439 0.0 0.0 0.0
2014 8753 0.0 0.0 0.0
2015 8679 0.0 0.0 0.0
2016 8758 0.0 0.0 0.0
2017 4436 0.0 0.0 0.0

For data sources see[5]

References