X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644162403000

Well Details

Well ID: 0644162403000
Loading map...
Location: 00/03-24-064-16W4/0
Location Alias: 00/03-24-64-16 W4M
Location Alias 2: 00/03-24-064-16 W4/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 16
Section: 24
County/Municipality: Buffalo Lake Metis Settlement
Well Name: CNRL FIGURE LAKE 3-24-64-16
Operator Name: Canadian Natural Resources Limited
License Number: 0174415
License Date: 1994-12-20
License Status: Suspension
Spud Date: 1995-01-12
Final Drill Date: 1995-01-14
Well Total Depth: 560.50 m
Surface Hole Latitude: 54.546574
Surface Hole Longitude: -112.290334

For data sources see[1][2]

Well History

Date Event
1994-12-20 Obtained License
1995-01-12 Surface Casing Operation Performed
1995-01-12 Well Log Performed
1995-01-14 Finished Drilling
1995-01-14 Well Log Performed
1995-01-15 Production Casing Operation Performed
1995-01-15 Rig Released
1995-02-04 Perforation Treatment Performed - Open-Hole Completion
1995-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-12 Perforation Treatment Performed - Jet Perforation
1995-02-12 Well Log Performed
1995-02-18 Well Mode changed to Drilled and Cased
1996-03-01 Well Began Production
1996-03-01 Well Fluid changed to Gas
1996-03-01 Well Mode changed to Flowing
2003-03-23 Perforation Treatment Performed - Jet Perforation
2003-03-23 Well Log Performed
2004-02-20 Perforation Treatment Performed - Jet Perforation
2004-02-20 Well Log Performed
2005-05-01 Well Fluid changed to Gas
2005-05-01 Well Mode changed to Suspended
2006-01-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-01-04 Plug Back Performed
2006-01-04 Well Fluid changed to Gas
2006-01-04 Well Mode changed to Abandoned Zone
2006-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-01-05 Plug Back Performed
2006-01-09 Perforation Treatment Performed - Jet Perforation
2006-01-10 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-02-04 Open Hole/Barefoot Completion 554.50 560.50 0
2006-01-09 Perforation 448.40 449.40 17
2006-01-10 Perforation 403.70 404.70 17
1995-02-11 Acid Treatment 554.50 560.50 0
1995-02-12 Perforation 466.00 469.00 13
2003-03-23 Perforation 526.50 528.00 20
2003-03-23 Perforation 529.50 530.50 20
2004-02-20 Perforation 422.20 424.00 17
2006-01-04 Packing Device Capped w/Cement 538.00 546.00 0
2006-01-05 Packing Device Capped w/Cement 456.00 464.00 0
2006-01-05 Packing Device Capped w/Cement 514.00 522.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 6705 0.0 0.0 0.0
1997 8701 0.0 0.0 0.0
1998 8712 0.0 0.0 0.0
1999 8145 0.0 0.0 0.0
2000 6010 0.0 0.0 0.0
2001 8048 0.0 0.0 0.0
2002 8215 0.0 0.0 0.0
2003 1416 0.0 0.0 0.0

For data sources see[5]

References