If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0644162511005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.565822,"lon":-112.292803,"icon":""}]} |
Location: 00/11-25-064-16W4/5 | |
Location Alias: 00/11-25-64-16 W4M | |
Location Alias 2: 00/11-25-064-16 W4/05 | |
Country: Canada | |
Province: Alberta | |
Township: 064 | |
Meridian: 4 | |
Range: 16 | |
Section: 25 | |
County/Municipality: Buffalo Lake Metis Settlement | |
Well Name: CNRL FIGURE LAKE 11-25-64-16 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0169196 | |
License Date: 1994-08-03 | |
License Status: Suspension | |
Spud Date: 1994-08-15 | |
Final Drill Date: 1994-08-17 | |
Well Total Depth: 556.00 m | |
Surface Hole Latitude: 54.565822 | |
Surface Hole Longitude: -112.292803 |
Date | Event |
---|---|
1994-08-03 | Obtained License |
1994-08-15 | Well Log Performed |
1994-08-16 | Surface Casing Operation Performed |
1994-08-17 | Finished Drilling |
1994-08-17 | Well Mode changed to Drilled and Cased |
1994-08-18 | Drill Stem Test Performed |
1994-08-18 | Well Log Performed |
1994-08-19 | Drill Stem Test Performed |
1994-08-20 | Drill Stem Test Performed |
1994-08-20 | Production Casing Operation Performed |
1994-08-21 | Rig Released |
1994-08-31 | Perforation Treatment Performed - Open-Hole Completion |
1994-08-31 | Well Log Performed |
1994-09-01 | Perforation Treatment Performed - Jet Perforation |
1994-09-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-08-26 | Well Log Performed |
1997-08-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-08-27 | Plug Back Performed |
1997-08-28 | Perforation Treatment Performed - Jet Perforation |
1998-02-06 | Well Log Performed |
1998-02-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-02-07 | Plug Back Performed |
1998-02-08 | Perforation Treatment Performed - Jet Perforation |
1998-02-08 | Well Mode changed to Drilled and Cased |
1999-11-23 | Perforation Treatment Performed - Jet Perforation |
1999-11-23 | Well Log Performed |
1999-12-01 | Well Began Production |
1999-12-01 | Well Fluid changed to Gas |
1999-12-01 | Well Mode changed to Flowing |
2002-12-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-12-13 | Plug Back Performed |
2002-12-13 | Well Log Performed |
2004-05-31 | Well Fluid changed to Gas |
2004-05-31 | Well Mode changed to Suspended |
2006-01-15 | Well Fluid changed to Gas |
2006-01-15 | Well Mode changed to Flowing |
2007-07-31 | Well Fluid changed to Gas |
2007-07-31 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-08-31 | Open Hole/Barefoot Completion | 555.00 | 556.00 | 0 |
1998-02-07 | Packing Device Capped w/Cement | 472.00 | 479.00 | 0 |
1998-02-08 | Perforation | 427.00 | 428.50 | 18 |
1999-11-23 | Perforation | 418.00 | 419.50 | 17 |
2002-12-13 | Packing Device Capped w/Cement | 421.00 | 425.00 | 0 |
1994-09-01 | Perforation | 550.00 | 555.00 | 13 |
1994-09-01 | Perforation | 460.50 | 463.50 | 13 |
1994-09-02 | Acid Treatment | 550.00 | 556.00 | 0 |
1997-08-27 | Packing Device Capped w/Cement | 532.00 | 540.00 | 0 |
1997-08-28 | Perforation | 486.00 | 487.50 | 13 |
1997-08-28 | Perforation | 399.70 | 400.50 | 13 |
1997-08-28 | Perforation | 407.00 | 408.00 | 13 |
1998-02-07 | Packing Device Capped w/Cement | 445.00 | 453.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 744 | 0.0 | 0.0 | 0.0 |
2000 | 665 | 0.0 | 0.0 | 0.0 |
2002 | 744 | 0.0 | 0.0 | 0.0 |
2003 | 1416 | 0.0 | 0.0 | 0.0 |
2006 | 1416 | 0.0 | 0.0 | 0.0 |
For data sources see[5]