X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644262208000

Well Details

Well ID: 0644262208000
Loading map...
Location: 00/08-22-064-26W4/0
Location Alias: 00/08-22-64-26 W4M
Location Alias 2: 00/08-22-064-26 W4/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 26
Section: 22
County/Municipality: Westlock County
Well Name: TREND ROYALITE BOLLOQUE LAKE NO 1
Operator Name: Triad Oil Manitoba Ltd
License Number: 0001196
License Date: 1950-02-25
License Status: RecExempt
Spud Date: 1950-03-09
Final Drill Date: 1950-04-13
Well Total Depth: 1183.50 m
Surface Hole Latitude: 54.549010
Surface Hole Longitude: -113.840017

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-02-25 Obtained License
1950-03-19 Drill Stem Test Performed
1950-03-23 Drill Stem Test Performed
1950-03-24 Drill Stem Test Performed
1950-03-26 Drill Stem Test Performed
1950-03-27 Drill Stem Test Performed
1950-03-31 Drill Stem Test Performed
1950-04-06 Drill Stem Test Performed
1950-04-13 Finished Drilling
1950-04-13 Well Mode changed to Drilled and Cased
1950-04-18 Production Casing Operation Performed
1950-05-09 Drill Stem Test Performed
1950-05-09 Perforation Treatment Performed - Bullet Perforation
1950-05-10 Drill Stem Test Performed
1950-05-10 Perforation Treatment Performed - Bullet Perforation
1950-06-06 Perforation Treatment Performed - Cement Squeeze
1950-06-15 Perforation Treatment Performed - Bullet Perforation
1950-08-28 Well Began Production
1950-08-28 Well Fluid changed to Crude Oil
1950-08-28 Well Mode changed to Pumping
1950-10-06 Perforation Treatment Performed - Cement Plug
1950-10-07 Well Fluid changed to Crude Oil
1950-10-07 Well Mode changed to Suspended
1961-09-07 Well Abandoned
1961-09-07 Well Fluid changed to Crude Oil
1961-09-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-05-09 Bullet Perforation 854.70 856.50 13
1950-05-10 Bullet Perforation 852.20 854.00 13
1950-06-06 Cement Squeeze 852.20 856.50 0
1950-06-15 Bullet Perforation 855.30 855.60 13
1950-10-06 Cement Plug 832.10 919.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References