X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645230301000

Well Details

Well ID: 0645230301000
Loading map...
Location: 00/01-03-064-23W5/0
Location Alias: 00/01-03-64-23 W5M
Location Alias 2: 00/01-03-064-23 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 23
Section: 03
County/Municipality: Municipal District of Greenview No. 16
Well Name: TANGLE CREEK HZ WAHIGAN 1-3-64-23
Operator Name: Tangle Creek Energy Ltd.
License Number: 0434949
License Date: 2011-07-06
License Status: Issued
Spud Date: 2011-08-22
Final Drill Date: 2011-09-08
Well Total Depth: 3953.00 m
Surface Hole Latitude: 54.503796
Surface Hole Longitude: -117.409116

For data sources see[1][2]

Well History

Date Event
2011-07-06 Obtained License
2011-08-23 Surface Casing Operation Performed
2011-08-26 Direction Drilling Operation Performed - Horizontal
2011-08-26 Well Log Performed
2011-08-31 Well Log Performed
2011-09-01 Intermediate Casing Operation Performed
2011-09-01 Well Log Performed
2011-09-08 Finished Drilling
2011-09-08 Well Mode changed to Drilled and Cased
2011-09-11 Liner Casing Operation Performed
2011-09-12 Rig Released
2011-09-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-15 Perforation Treatment Performed - Open-Hole Completion
2011-09-16 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-03 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-06 Well Began Production
2011-11-06 Well Fluid changed to Crude Oil
2011-11-06 Well Mode changed to Flowing
2012-01-22 Well Fluid changed to Crude Oil
2012-01-22 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-26 1902.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-15 Open Hole/Barefoot Completion 3947.00 3953.00 0
2011-10-03 Multi-Stage Fracture 3153.00 3153.10 0
2011-10-03 Multi-Stage Fracture 3070.30 3070.40 0
2011-10-03 Multi-Stage Fracture 2987.70 2987.80 0
2011-10-03 Multi-Stage Fracture 2905.10 2905.20 0
2011-10-03 Multi-Stage Fracture 2822.50 2822.60 0
2011-10-03 Multi-Stage Fracture 2739.90 2740.00 0
2011-10-03 Multi-Stage Fracture 2658.30 2658.40 0
2011-10-03 Multi-Stage Fracture 2562.70 2562.80 0
2011-10-03 Multi-Stage Fracture 2480.00 2480.10 0
2011-09-15 Multi-Stage Fracture 3912.90 3913.00 0
2011-09-16 Multi-Stage Fracture 3823.40 3823.50 0
2011-09-22 Multi-Stage Fracture 3741.90 3742.00 0
2011-09-22 Multi-Stage Fracture 3660.70 3660.80 0
2011-09-30 Multi-Stage Fracture 3578.00 3578.10 0
2011-09-30 Multi-Stage Fracture 3495.40 3495.50 0
2011-10-03 Multi-Stage Fracture 3330.20 3330.30 0
2011-10-03 Multi-Stage Fracture 3234.70 3234.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1259 0.0 0.0 0.0
2012 8462 0.0 0.0 0.0
2013 7887 0.0 0.0 0.0
2014 7811 0.0 0.0 0.0
2015 5229 0.0 0.0 0.0
2016 8309 0.0 0.0 0.0
2017 5571 0.0 0.0 0.0
2018 7433 0.0 0.0 0.0
2019 6523 0.0 0.0 0.0

For data sources see[6]

References