If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0645230305000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.507134,"lon":-117.378446,"icon":""}]} |
Location: 00/05-03-064-23W5/0 | |
Location Alias: 00/05-03-64-23 W5M | |
Location Alias 2: 00/05-03-064-23 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 064 | |
Meridian: 5 | |
Range: 23 | |
Section: 03 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TANGLE CREEK HZ WAHIGAN 5-3-64-23 | |
Operator Name: Tangle Creek Energy Ltd. | |
License Number: 0443957 | |
License Date: 2012-02-09 | |
License Status: Issued | |
Spud Date: 2012-06-05 | |
Final Drill Date: 2012-06-18 | |
Well Total Depth: 3690.00 m | |
Surface Hole Latitude: 54.507134 | |
Surface Hole Longitude: -117.378446 |
Date | Event |
---|---|
2012-02-09 | Obtained License |
2012-06-06 | Surface Casing Operation Performed |
2012-06-10 | Direction Drilling Operation Performed - Deviate |
2012-06-12 | Direction Drilling Operation Performed - Horizontal |
2012-06-14 | Intermediate Casing Operation Performed |
2012-06-18 | Finished Drilling |
2012-06-18 | Well Mode changed to Drilled and Cased |
2012-06-19 | Well Log Performed |
2012-06-20 | Liner Casing Operation Performed |
2012-06-21 | Rig Released |
2012-07-10 | Well Log Performed |
2012-07-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-28 | Perforation Treatment Performed - Open-Hole Completion |
2012-08-07 | Well Began Production |
2012-08-07 | Well Fluid changed to Crude Oil |
2012-08-07 | Well Mode changed to Flowing |
2012-08-29 | Well Fluid changed to Crude Oil |
2012-08-29 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-06-05 | Beaver Drilling Ltd. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-06-10 | 1892.40 | Deviate (5 - 79 degrees) |
2012-06-12 | 2237.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-07-28 | Open Hole/Barefoot Completion | 3685.00 | 3690.00 | 0 |
2012-07-28 | Multi-Stage Fracture | 3020.20 | 3020.30 | 0 |
2012-07-28 | Multi-Stage Fracture | 2937.20 | 2937.30 | 0 |
2012-07-28 | Multi-Stage Fracture | 2853.20 | 2853.30 | 0 |
2012-07-28 | Multi-Stage Fracture | 2782.50 | 2782.60 | 0 |
2012-07-28 | Multi-Stage Fracture | 2702.30 | 2702.40 | 0 |
2012-07-28 | Multi-Stage Fracture | 2620.20 | 2620.30 | 0 |
2012-07-28 | Multi-Stage Fracture | 2537.40 | 2537.50 | 0 |
2012-07-28 | Multi-Stage Fracture | 2466.10 | 3466.20 | 0 |
2012-07-28 | Multi-Stage Fracture | 2383.20 | 2383.30 | 0 |
2012-07-28 | Multi-Stage Fracture | 2298.70 | 2298.80 | 0 |
2012-07-28 | Multi-Stage Fracture | 3650.20 | 3650.30 | 0 |
2012-07-28 | Multi-Stage Fracture | 3573.30 | 3573.40 | 0 |
2012-07-28 | Multi-Stage Fracture | 3490.70 | 3490.80 | 0 |
2012-07-28 | Multi-Stage Fracture | 3410.00 | 3410.10 | 0 |
2012-07-28 | Multi-Stage Fracture | 3340.40 | 3340.50 | 0 |
2012-07-28 | Multi-Stage Fracture | 3256.80 | 3256.90 | 0 |
2012-07-28 | Multi-Stage Fracture | 3173.70 | 3173.80 | 0 |
2012-07-28 | Multi-Stage Fracture | 3090.00 | 3090.10 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 3037 | 0.0 | 0.0 | 0.0 |
2013 | 8256 | 0.0 | 0.0 | 0.0 |
2014 | 8489 | 0.0 | 0.0 | 0.0 |
2015 | 8364 | 0.0 | 0.0 | 0.0 |
2016 | 6588 | 0.0 | 0.0 | 0.0 |
2017 | 6499 | 0.0 | 0.0 | 0.0 |
2018 | 3221 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-06-21 | No Incident Encountered | 0.00 | 0.00 |
2012-08-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]