If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0646062904020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.575039,"lon":-118.879665,"icon":""}]} |
| Location: 02/04-29-064-06W6/0 | |
| Location Alias: 02/04-29-64-06 W6M | |
| Location Alias 2: 02/04-29-064-06 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 29 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: HOC HZ KAKWA 4-29-64-6 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0475814 | |
| License Date: 2015-06-18 | |
| License Status: Issued | |
| Spud Date: 2015-07-08 | |
| Final Drill Date: 2015-08-30 | |
| Well Total Depth: 4797.00 m | |
| Surface Hole Latitude: 54.575039 | |
| Surface Hole Longitude: -118.879665 |
| Date | Event |
|---|---|
| 2015-06-18 | Obtained License |
| 2015-07-08 | Lost Circulation Occurred |
| 2015-07-11 | Lost Circulation Occurred |
| 2015-07-11 | Surface Casing Operation Performed |
| 2015-07-29 | Direction Drilling Operation Performed - Deviate |
| 2015-08-06 | Well Log Performed |
| 2015-08-08 | Intermediate Casing Operation Performed |
| 2015-08-09 | Well Log Performed |
| 2015-08-10 | Direction Drilling Operation Performed - Horizontal |
| 2015-08-30 | Finished Drilling |
| 2015-08-30 | Well Log Performed |
| 2015-08-30 | Well Mode changed to Drilled and Cased |
| 2015-09-01 | Perforation Treatment Performed - Open-Hole Completion |
| 2015-09-01 | Production Casing Operation Performed |
| 2015-09-03 | Rig Released |
| 2015-11-19 | Well Log Performed |
| 2015-12-01 | Well Fluid changed to Gas |
| 2015-12-01 | Well Mode changed to Testing |
| 2015-12-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-12-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-12-05 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-01-02 | Well Began Production |
| 2016-01-02 | Well Fluid changed to Gas |
| 2016-01-02 | Well Mode changed to Flowing |
| 2016-05-15 | Well Log Performed |
| 2016-05-16 | Well Log Performed |
| 2016-05-19 | Well Log Performed |
| 2016-05-20 | Well Log Performed |
| 2016-05-21 | Well Log Performed |
| 2016-05-25 | Well Log Performed |
| 2016-05-26 | Perforation Treatment Performed - Jet Perforation |
| 2016-05-26 | Well Log Performed |
| 2016-05-27 | Perforation Treatment Performed - Cement Squeeze |
| 2016-05-29 | Perforation Treatment Performed - Jet Perforation |
| 2016-05-29 | Well Log Performed |
| 2016-05-30 | Perforation Treatment Performed - Cement Squeeze |
| 2016-06-02 | Well Log Performed |
| 2017-07-10 | Well Fluid changed to Gas |
| 2017-07-10 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2015-07-08 | Nabors Drilling Limited | 57 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2015-07-29 | 3111.50 | Deviate (5 - 79 degrees) |
| 2015-08-10 | 3338.50 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2015-09-01 | Open Hole/Barefoot Completion | 4784.00 | 4797.00 | 0 |
| 2015-12-04 | Multi-Stage Fracture | 4411.50 | 4411.60 | 0 |
| 2015-12-04 | Multi-Stage Fracture | 4364.80 | 4364.90 | 0 |
| 2015-12-04 | Multi-Stage Fracture | 4318.20 | 4318.30 | 0 |
| 2015-12-04 | Multi-Stage Fracture | 4271.40 | 4271.50 | 0 |
| 2015-12-04 | Multi-Stage Fracture | 4225.00 | 4225.10 | 0 |
| 2015-12-04 | Multi-Stage Fracture | 4191.70 | 4191.80 | 0 |
| 2015-12-04 | Multi-Stage Fracture | 4145.00 | 4145.10 | 0 |
| 2015-12-04 | Multi-Stage Fracture | 4098.30 | 4098.40 | 0 |
| 2015-12-04 | Multi-Stage Fracture | 4051.80 | 4051.90 | 0 |
| 2015-12-04 | Multi-Stage Fracture | 4018.40 | 4018.50 | 0 |
| 2015-12-03 | Multi-Stage Fracture | 4762.00 | 4762.10 | 0 |
| 2015-12-04 | Multi-Stage Fracture | 3971.90 | 3972.00 | 0 |
| 2015-12-05 | Multi-Stage Fracture | 3925.20 | 3925.30 | 0 |
| 2015-12-05 | Multi-Stage Fracture | 3878.60 | 3878.70 | 0 |
| 2015-12-05 | Multi-Stage Fracture | 3831.90 | 3832.00 | 0 |
| 2015-12-05 | Multi-Stage Fracture | 3785.20 | 3785.30 | 0 |
| 2015-12-05 | Multi-Stage Fracture | 3751.80 | 3751.90 | 0 |
| 2015-12-05 | Multi-Stage Fracture | 3705.10 | 3705.20 | 0 |
| 2015-12-05 | Multi-Stage Fracture | 3658.60 | 3658.70 | 0 |
| 2015-12-05 | Multi-Stage Fracture | 3611.90 | 3612.00 | 0 |
| 2015-12-05 | Multi-Stage Fracture | 3565.20 | 3565.30 | 0 |
| 2015-12-03 | Multi-Stage Fracture | 4725.50 | 4725.60 | 0 |
| 2015-12-05 | Multi-Stage Fracture | 3531.90 | 3532.00 | 0 |
| 2015-12-05 | Multi-Stage Fracture | 3485.20 | 3485.30 | 0 |
| 2016-05-26 | Perforation | 1800.00 | 1801.00 | 20 |
| 2016-05-27 | Cement Squeeze | 1800.00 | 1801.00 | 0 |
| 2016-05-29 | Perforation | 1555.00 | 1556.00 | 20 |
| 2016-05-30 | Cement Squeeze | 1555.00 | 1556.00 | 0 |
| 2015-12-03 | Multi-Stage Fracture | 4678.30 | 4678.40 | 0 |
| 2015-12-03 | Multi-Stage Fracture | 4631.60 | 4631.70 | 0 |
| 2015-12-03 | Multi-Stage Fracture | 4585.00 | 4585.10 | 0 |
| 2015-12-04 | Multi-Stage Fracture | 4538.30 | 4538.40 | 0 |
| 2015-12-04 | Multi-Stage Fracture | 4505.00 | 4505.10 | 0 |
| 2015-12-04 | Multi-Stage Fracture | 4458.20 | 4458.30 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-12-03 | 2015-12-05 | 3,299 | 13,515 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 82.8967 | N/A | |||
| 40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 15.0065 | N/A | ||
| 40/80 HydroProp | Calfrac | Mullite | 1302-93-8 | 100 | 1.7528 | N/A | ||
| Silica Crystalline-Cristobalite | 14464-46-1 | 100 | 1.7528 | N/A | ||||
| Silicon Dioxide. (amorphous as glass) | 7631-86-9 | 100 | 1.7528 | N/A | ||||
| DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0119 | N/A | |
| Water | 7732-18-5 | 100 | 0.0121 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0755 | N/A | |
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 0.4987 | N/A | |
| DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0902 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-11-30 | 2015-12-07 | Surface Water - Runoff | 13425 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 24 | 0.0 | 0.0 | 0.0 |
| 2016 | 2606 | 0.0 | 0.0 | 0.0 |
| 2017 | 7182 | 0.0 | 0.0 | 0.0 |
| 2018 | 7802 | 0.0 | 0.0 | 0.0 |
| 2019 | 5096 | 0.0 | 0.0 | 0.0 |
| 2020 | 1430 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-07-08 | Lost Circulation | 80.00 | 124.00 |
| 2015-07-11 | Lost Circulation | 615.00 | 615.00 |
| 2015-12-08 | No Incident Encountered | 0.00 | 0.00 |
| 2016-06-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]