X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0646072107000

Well Details

Well ID: 0646072107000
Loading map...
Location: 00/07-21-064-07W6/0
Location Alias: 00/07-21-64-07 W6M
Location Alias 2: 00/07-21-064-07 W6/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 6
Range: 07
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: HARVEST WAPITI 7-21-64-7
Operator Name: Harvest Operations Corp.
License Number: 0076835
License Date: 1979-07-10
License Status: Suspension
Spud Date: 1979-07-22
Final Drill Date: 1979-11-21
Well Total Depth: 3763.00 m
Surface Hole Latitude: 54.549806
Surface Hole Longitude: -118.990178

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-07-10 Obtained License
1979-07-22 Lost Circulation Occurred
1979-09-17 Drill Stem Test Performed
1979-09-21 Kick Occurred
1979-09-27 Drill Stem Test Performed
1979-11-21 Finished Drilling
1979-11-21 Well Log Performed
1979-11-25 Liner Casing Operation Performed
1979-11-25 Lost Circulation Occurred
1979-12-17 Perforation Treatment Performed - Jet Perforation
1979-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-18 Perforation Treatment Performed - Fractured
1980-01-20 Perforation Treatment Performed - Jet Perforation
1980-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-01-28 Plug Back Performed
1980-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-01-31 Perforation Treatment Performed - Jet Perforation
1980-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-06 Perforation Treatment Performed - Fractured
1980-05-26 Well Mode changed to Drilled and Cased
1994-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-28 Perforation Treatment Performed - Jet Perforation
1994-02-28 Plug Back Performed
1994-02-28 Well Log Performed
1994-02-28 Well Mode changed to Abandoned Zone
1994-03-01 Perforation Treatment Performed - Remedial Casing
1994-03-03 Perforation Treatment Performed - Cement Plug
1994-05-15 Perforation Treatment Performed - Jet Perforation
1994-05-16 Perforation Treatment Performed - Jet Perforation
1994-05-18 Perforation Treatment Performed - Cement Squeeze
1994-05-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-19 Plug Back Performed
1994-05-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-20 Plug Back Performed
1994-05-20 Well Log Performed
1994-07-09 Perforation Treatment Performed - Jet Perforation
1994-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-18 Well Log Performed
1994-07-19 Perforation Treatment Performed - Jet Perforation
1994-07-19 Well Log Performed
1994-07-21 Perforation Treatment Performed - Fractured
2006-09-11 Well Log Performed
2006-09-12 Well Log Performed
2006-09-14 Perforation Treatment Performed - Cement Squeeze
2006-09-14 Plug Back Performed
2006-10-01 Well Began Production
2006-10-01 Well Fluid changed to Gas
2006-10-01 Well Mode changed to Flowing
2006-10-18 Perforation Treatment Performed - Jet Perforation
2006-10-18 Well Log Performed
2006-11-07 Perforation Treatment Performed - Fractured
2007-01-01 Well Fluid changed to Gas
2007-01-01 Well Mode changed to Pumping
2019-09-25 Well Fluid changed to Gas
2019-09-25 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-12-17 Perforation 3664.00 3665.00 13
1980-02-03 Acid Treatment 3071.00 3078.00 0
1980-02-06 Fracture 3071.00 3078.00 0
1994-02-28 Packing Device Capped w/Cement 3042.00 3050.00 0
1994-02-28 Perforation 473.00 473.50 7
1994-03-01 Remedial Casing Cementing 473.00 473.50 0
1994-03-03 Cement Plug 465.50 473.50 0
1994-05-15 Perforation 603.00 603.50 13
1994-05-15 Perforation 1605.00 1605.70 13
1994-05-16 Perforation 1200.00 1200.50 14
1994-05-18 Cement Squeeze 603.00 1200.50 0
1979-12-17 Perforation 3666.00 3669.00 13
1994-05-19 Packing Device Capped w/Cement 597.50 605.50 0
1994-05-20 Packing Device Capped w/Cement 463.00 482.00 0
1994-07-09 Perforation 2999.00 3002.00 20
1994-07-14 Acid Treatment 2999.00 3002.00 0
1994-07-19 Perforation 2702.50 2705.00 13
1994-07-21 Fracture 2702.50 2705.00 0
2006-09-14 Cement Squeeze 2702.50 2705.00 0
2006-10-18 Perforation 2999.00 3002.00 20
2006-11-07 Fracture 2999.00 3002.00 0
1979-12-18 Acid Treatment 3664.00 3669.00 0
1979-12-18 Fracture 3664.00 3669.00 0
1980-01-20 Perforation 3173.50 3178.00 6
1980-01-22 Acid Treatment 3173.50 3178.00 0
1980-01-28 Packing Device Capped w/Cement 3153.00 3198.50 0
1980-01-31 Perforation 3071.00 3078.00 3
1980-01-31 Acid Treatment 3071.00 3078.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 1200 0.0 0.0 0.0
2007 7429 0.0 0.0 0.0
2008 7655 0.0 0.0 0.0
2009 6169 0.0 0.0 0.0
2010 6439 0.0 0.0 0.0
2011 5376 0.0 0.0 0.0
2012 6008 0.0 0.0 0.0
2013 4360 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8639 0.0 0.0 0.0
2016 8399 0.0 0.0 0.0
2017 7949 0.0 0.0 0.0
2018 8125 0.0 0.0 0.0
2019 3024 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-07-22 Lost Circulation 60.00 60.00
1979-09-21 Kick 2705.00 2705.00
1979-11-25 Lost Circulation 3763.00 3763.00

For data sources see[6]

References