If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0646113510000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.584532,"lon":-119.544541,"icon":""}]} |
| Location: 00/10-35-064-11W6/0 | |
| Location Alias: 00/10-35-64-11 W6M | |
| Location Alias 2: 00/10-35-064-11 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 6 | |
| Range: 11 | |
| Section: 35 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: AMOCO CTBKR 10-35-64-11 | |
| Operator Name: BP Canada Energy Group ULC | |
| License Number: 0076585 | |
| License Date: 1979-06-26 | |
| License Status: RecCertified | |
| Spud Date: 1979-07-03 | |
| Final Drill Date: 1979-09-17 | |
| Well Total Depth: 2940.00 m | |
| Surface Hole Latitude: 54.584532 | |
| Surface Hole Longitude: -119.544541 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1979-06-26 | Obtained License |
| 1979-07-03 | Lost Circulation Occurred |
| 1979-07-16 | Lost Circulation Occurred |
| 1979-07-20 | Lost Circulation Occurred |
| 1979-07-30 | Lost Circulation Occurred |
| 1979-08-17 | Drill Stem Test Performed |
| 1979-09-17 | Finished Drilling |
| 1979-10-26 | Production Casing Operation Performed |
| 1979-11-10 | Perforation Treatment Performed - Jet Perforation |
| 1979-11-19 | Perforation Treatment Performed - Fractured |
| 1979-11-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1979-11-29 | Perforation Treatment Performed - Jet Perforation |
| 1979-12-01 | Perforation Treatment Performed - Jet Perforation |
| 1979-12-02 | Perforation Treatment Performed - Fractured |
| 1979-12-19 | Perforation Treatment Performed - Fractured |
| 1980-01-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1980-01-11 | Perforation Treatment Performed - Jet Perforation |
| 1980-02-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1980-02-08 | Perforation Treatment Performed - Fractured |
| 1980-02-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1980-04-15 | Well Mode changed to Drilled and Cased |
| 1990-10-01 | Perforation Treatment Performed - Cement Plug |
| 1990-10-01 | Plug Back Performed |
| 1990-10-01 | Well Abandoned |
| 1990-10-01 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1979-11-10 | Perforation | 2875.00 | 2879.00 | 7 |
| 1980-01-11 | Perforation | 2062.00 | 2065.50 | 7 |
| 1980-02-02 | Packing Device Capped w/Cement | 2810.00 | 2810.00 | 0 |
| 1980-02-08 | Fracture | 2062.00 | 2065.50 | 0 |
| 1980-02-16 | Packing Device Capped w/Cement | 2040.00 | 2045.00 | 0 |
| 1990-10-01 | Cement Plug | 2033.00 | 2040.00 | 0 |
| 1979-11-19 | Fracture | 2875.00 | 2879.00 | 0 |
| 1979-11-29 | Packing Device Capped w/Cement | 2871.00 | 2871.00 | 0 |
| 1979-11-29 | Perforation | 2849.00 | 2852.00 | 7 |
| 1979-12-01 | Perforation | 2835.00 | 2837.00 | 7 |
| 1979-12-01 | Perforation | 2838.00 | 2840.00 | 7 |
| 1979-12-02 | Fracture | 2835.00 | 2852.00 | 0 |
| 1979-12-19 | Fracture | 2835.00 | 2840.00 | 0 |
| 1980-01-10 | Packing Device Capped w/Cement | 2825.00 | 2825.00 | 0 |
For data sources see[4]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1979-07-03 | Lost Circulation | 60.00 | 160.00 |
| 1979-07-16 | Lost Circulation | 1090.00 | 1090.00 |
| 1979-07-20 | Lost Circulation | 1356.00 | 1356.00 |
| 1979-07-30 | Lost Circulation | 1041.00 | 1041.00 |
For data sources see[5]