X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0654021407AA0

Well Details

Well ID: 0654021407AA0
Loading map...
Location: AA/07-14-065-02W4/0
Location Alias: AA/07-14-65-02 W4M
Location Alias 2: AA/07-14-065-02 W4/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 4
Range: 02
Section: 14
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: TALISMAN 7AA MARIE 7-14-65-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0063906A
License Date: 1977-05-19
License Status: RecCertified
Spud Date: 1977-06-29
Final Drill Date: 1977-07-02
Well Total Depth: 563.80 m
Surface Hole Latitude: 54.621002
Surface Hole Longitude: -110.192168

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-05-19 Obtained License
1977-07-02 Finished Drilling
1977-07-02 Well Log Performed
1977-07-02 Well Mode changed to Drilled and Cased
1977-07-03 Production Casing Operation Performed
1977-09-29 Well Log Performed
1977-10-31 Perforation Treatment Performed - Jet Perforation
1977-12-01 Well Began Production
1977-12-01 Well Fluid changed to Crude Bitumen
1977-12-01 Well Type changed to Cyclical
1978-01-24 Well Log Performed
1978-10-05 Well Log Performed
1978-11-08 Well Log Performed
1979-11-21 Well Fluid changed to Crude Bitumen
1979-11-21 Well Mode changed to Suspended
1979-11-21 Well Type changed to Cyclical
1985-04-01 Well Fluid changed to Crude Bitumen
1985-04-01 Well Type changed to Cyclical
1988-05-11 Well Fluid changed to Crude Bitumen
1988-05-11 Well Mode changed to Suspended
1988-05-11 Well Type changed to Cyclical
1992-05-13 Perforation Treatment Performed - Cement Plug
1992-05-13 Well Fluid changed to Crude Bitumen
1992-05-13 Well Mode changed to Abandoned
1992-05-13 Well Type changed to Cyclical
1992-07-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-10-31 Perforation 432.80 435.90 13
1977-10-31 Perforation 423.70 426.70 13
1992-05-13 Cement Plug 273.00 411.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 96 0.0 0.0 0.0
1978 4837 0.0 0.0 0.0
1979 5483 0.0 0.0 0.0
1985 4577 0.0 0.0 0.0
1986 3997 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 1347 0.0 0.0 0.0

For data sources see[5]

References