X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0654021408AA0

Well Details

Well ID: 0654021408AA0
Loading map...
Location: AA/08-14-065-02W4/0
Location Alias: AA/08-14-65-02 W4M
Location Alias 2: AA/08-14-065-02 W4/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 4
Range: 02
Section: 14
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: BVI X2 COLD LAKE EX 8-14-65-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0123785
License Date: 1986-09-02
License Status: RecCertified
Spud Date: 1986-10-02
Final Drill Date: 1986-10-05
Well Total Depth: 500.00 m
Surface Hole Latitude: 54.623286
Surface Hole Longitude: -110.185985

For data sources see[1][2]

Well History

Date Event
1986-09-02 Obtained License
1986-10-02 Direction Drilling Operation Performed - Deviate
1986-10-04 Well Log Performed
1986-10-05 Finished Drilling
1986-10-05 Well Log Performed
1986-10-05 Well Mode changed to Drilled and Cased
1986-10-06 Production Casing Operation Performed
1986-10-06 Rig Released
1986-10-15 Well Log Performed
1986-12-07 Perforation Treatment Performed - Jet Perforation
1987-01-12 Well Log Performed
1987-01-18 Well Began Production
1987-01-18 Well Fluid changed to Crude Bitumen
1987-01-18 Well Type changed to Cyclical
1987-10-19 Perforation Treatment Performed - Jet Perforation
1988-10-19 Perforation Treatment Performed - Cement Squeeze
1988-10-20 Perforation Treatment Performed - Jet Perforation
1990-08-31 Well Fluid changed to Crude Bitumen
1990-08-31 Well Mode changed to Suspended
1990-08-31 Well Type changed to Cyclical
1992-05-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-05-14 Plug Back Performed
1992-05-14 Well Fluid changed to Crude Bitumen
1992-05-14 Well Mode changed to Abandoned
1992-05-14 Well Type changed to Cyclical
1992-07-01 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1986-10-02 39.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-12-07 Perforation 471.00 473.00 13
1986-12-07 Perforation 475.00 476.50 13
1986-12-07 Perforation 477.50 479.00 13
1987-10-19 Perforation 480.00 484.00 13
1988-10-19 Cement Squeeze 471.00 484.00 0
1988-10-20 Perforation 462.00 465.00 13
1992-05-14 Packing Device Capped w/Cement 309.00 450.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 5363 0.0 0.0 0.0
1988 3670 0.0 0.0 0.0
1989 2252 0.0 0.0 0.0

For data sources see[6]

References