X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0654021408AJ0

Well Details

Well ID: 0654021408AJ0
Loading map...
Location: AJ/08-14-065-02W4/0
Location Alias: AJ/08-14-65-02 W4M
Location Alias 2: AJ/08-14-065-02 W4/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 4
Range: 02
Section: 14
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: BVI A2 MARIE EX 8-14-65-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0107957
License Date: 1984-06-28
License Status: RecCertified
Spud Date: 1984-07-23
Final Drill Date: 1984-07-25
Well Total Depth: 473.20 m
Surface Hole Latitude: 54.620357
Surface Hole Longitude: -110.186418

For data sources see[1][2]

Well History

Date Event
1984-06-28 Obtained License
1984-07-23 Surface Casing Operation Performed
1984-07-24 Direction Drilling Operation Performed - Deviate
1984-07-25 Finished Drilling
1984-07-25 Well Log Performed
1984-07-25 Well Mode changed to Drilled and Cased
1984-07-26 Production Casing Operation Performed
1984-07-26 Rig Released
1984-08-02 Well Log Performed
1984-10-18 Perforation Treatment Performed - Jet Perforation
1984-10-18 Well Log Performed
1985-02-22 Perforation Treatment Performed - Jet Perforation
1985-02-23 Well Log Performed
1985-02-28 Well Began Production
1985-02-28 Well Fluid changed to Crude Bitumen
1985-02-28 Well Type changed to Cyclical
1987-03-07 Perforation Treatment Performed - Jet Perforation
1990-08-31 Well Fluid changed to Crude Bitumen
1990-08-31 Well Mode changed to Suspended
1990-08-31 Well Type changed to Cyclical
1992-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-05-12 Plug Back Performed
1992-05-12 Well Fluid changed to Crude Bitumen
1992-05-12 Well Mode changed to Abandoned
1992-05-12 Well Type changed to Cyclical
1992-07-01 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-07-24 59.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-10-18 Perforation 460.40 462.50 13
1985-02-22 Perforation 457.50 462.50 13
1987-03-07 Perforation 464.50 468.50 13
1992-05-12 Packing Device Capped w/Cement 303.00 436.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 3748 0.0 0.0 0.0
1986 5750 0.0 0.0 0.0
1987 6529 0.0 0.0 0.0
1988 5671 0.0 0.0 0.0
1989 5787 0.0 0.0 0.0
1990 5073 0.0 0.0 0.0

For data sources see[6]

References