X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0654131910000

Well Details

Well ID: 0654131910000
Loading map...
Location: 00/10-19-065-13W4/0
Location Alias: 00/10-19-65-13 W4M
Location Alias 2: 00/10-19-065-13 W4/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 4
Range: 13
Section: 19
County/Municipality: Lac La Biche County
Well Name: SOC CRAIGND 10-19-65-13
Operator Name: AlphaBow Energy Ltd.
License Number: 0061787
License Date: 1976-12-28
License Status: Abandoned
Spud Date: 1976-12-29
Final Drill Date: 1977-01-04
Well Total Depth: 483.40 m
Surface Hole Latitude: 54.640286
Surface Hole Longitude: -111.956958

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-12-28 Obtained License
1977-01-02 Production Casing Operation Performed
1977-01-04 Finished Drilling
1977-01-04 Perforation Treatment Performed - Open-Hole Completion
1977-01-04 Well Mode changed to Drilled and Cased
1977-02-11 Well Began Production
1977-02-11 Well Fluid changed to Gas
1977-02-11 Well Mode changed to Flowing
1983-02-01 Well Fluid changed to Gas
1983-02-01 Well Mode changed to Suspended
1997-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-13 Plug Back Performed
1997-02-13 Well Fluid changed to Gas
1997-02-13 Well Mode changed to Abandoned Zone
1999-09-04 Well Abandoned
1999-09-04 Well Fluid changed to Gas
1999-09-04 Well Mode changed to Abandoned
2010-11-12 Well Log Performed
2010-11-13 Perforation Treatment Performed - Jet Perforation
2010-11-13 Well Log Performed
2010-11-14 Perforation Treatment Performed - Remedial Casing
2010-11-16 Perforation Treatment Performed - Jet Perforation
2010-11-16 Well Log Performed
2010-11-17 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-01-04 Open Hole/Barefoot Completion 476.70 483.40 0
2010-11-17 Remedial Casing Cementing 174.50 177.50 0
1997-02-13 Packing Device Capped w/Cement 185.00 462.00 0
2010-11-13 Perforation 295.50 297.50 20
2010-11-13 Perforation 295.50 297.50 20
2010-11-13 Perforation 296.80 297.50 99
2010-11-14 Remedial Casing Cementing 295.50 297.50 0
2010-11-16 Perforation 174.50 175.50 20
2010-11-16 Perforation 174.50 177.50 17
2010-11-16 Perforation 175.00 175.60 99

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 6766 0.0 0.0 0.0
1978 5547 0.0 0.0 0.0
1979 6064 0.0 0.0 0.0
1980 4613 0.0 0.0 0.0
1981 4220 0.0 0.0 0.0

For data sources see[5]

References