X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0654132110000

Well Details

Well ID: 0654132110000
Loading map...
Location: 00/10-21-065-13W4/0
Location Alias: 00/10-21-65-13 W4M
Location Alias 2: 00/10-21-065-13 W4/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 4
Range: 13
Section: 21
County/Municipality: Beaver Lake 131
Well Name: SOC CRAIGND 10-21-65-13
Operator Name: AlphaBow Energy Ltd.
License Number: 0023306
License Date: 1962-11-08
License Status: Abandoned
Spud Date: 1962-11-14
Final Drill Date: 1962-11-28
Well Total Depth: 542.50 m
Surface Hole Latitude: 54.640237
Surface Hole Longitude: -111.905507

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-11-08 Obtained License
1962-11-19 Drill Stem Test Performed
1962-11-20 Drill Stem Test Performed
1962-11-21 Production Casing Operation Performed
1962-11-25 Lost Circulation Occurred
1962-11-28 Drill Stem Test Performed
1962-11-28 Finished Drilling
1962-11-28 Perforation Treatment Performed - Open-Hole Completion
1962-11-30 Perforation Treatment Performed - Cement Plug
1962-12-14 Well Mode changed to Drilled and Cased
1967-10-04 Perforation Treatment Performed - Jet Perforation
1967-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-10-05 Perforation Treatment Performed - Cement Squeeze
1967-10-06 Perforation Treatment Performed - Acid Wash - No Pressure
1967-10-06 Perforation Treatment Performed - Cement Squeeze
1967-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-10-08 Perforation Treatment Performed - Selective Jet Perforations
1967-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-10-11 Perforation Treatment Performed - Cement Squeeze
1967-10-14 Perforation Treatment Performed - Jet Perforation
1967-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-10-17 Perforation Treatment Performed - Cement Squeeze
1967-10-20 Perforation Treatment Performed - Open-Hole Completion
1967-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-10-06 Well Began Production
1969-10-06 Well Fluid changed to Gas
1969-10-06 Well Mode changed to Flowing
1989-06-30 Well Fluid changed to Gas
1989-06-30 Well Mode changed to Suspended
2007-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-17 Plug Back Performed
2007-03-17 Well Fluid changed to Gas
2007-03-17 Well Log Performed
2007-03-17 Well Mode changed to Abandoned Zone
2013-05-31 Well Log Performed
2013-06-01 Perforation Treatment Performed - Jet Perforation
2013-06-01 Well Log Performed
2013-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-06-03 Perforation Treatment Performed - Remedial Casing
2013-06-05 Well Log Performed
2013-06-06 Perforation Treatment Performed - Jet Perforation
2013-06-06 Well Log Performed
2013-06-08 Perforation Treatment Performed - Remedial Casing
2013-06-09 Well Log Performed
2013-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-06-10 Perforation Treatment Performed - Jet Perforation
2013-06-10 Well Log Performed
2013-06-12 Perforation Treatment Performed - Remedial Casing
2013-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-06-13 Plug Back Performed
2013-11-09 Well Abandoned
2013-11-09 Well Fluid changed to Gas
2013-11-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-11-28 Open Hole/Barefoot Completion 478.50 542.50 0
1967-10-06 Cement Squeeze 320.00 320.00 0
1967-10-06 Cement Squeeze 277.40 277.40 0
1967-10-08 Selective Jet Perforations 293.50 293.80 0
1967-10-08 Selective Jet Perforations 295.70 296.30 0
1967-10-08 Selective Jet Perforations 297.80 298.10 0
1967-10-08 Selective Jet Perforations 299.00 299.60 0
1967-10-08 Selective Jet Perforations 301.40 302.70 0
1967-10-08 Acid Treatment 293.50 302.70 0
1967-10-10 Acid Treatment 293.50 302.70 0
1967-10-11 Cement Squeeze 293.50 302.70 0
1962-11-30 Cement Plug 492.30 542.50 0
1967-10-14 Perforation 335.00 336.20 7
1967-10-15 Acid Treatment 335.00 336.20 0
1967-10-17 Cement Squeeze 335.00 336.20 0
1967-10-20 Open Hole/Barefoot Completion 478.50 486.20 0
1967-10-21 Acid Treatment 478.50 486.20 0
2007-03-17 Packing Device Capped w/Cement 462.50 470.50 0
2013-06-01 Perforation 333.00 336.00 20
2013-06-03 Remedial Casing Cementing 333.00 336.00 0
2013-06-03 Packing Device Capped w/Cement 322.00 331.00 0
2013-06-06 Perforation 210.20 213.20 20
1962-11-30 Cement Plug 445.00 492.30 0
2013-06-08 Remedial Casing Cementing 210.20 213.20 0
2013-06-10 Packing Device Capped w/Cement 198.00 207.00 0
2013-06-10 Perforation 169.00 172.00 20
2013-06-12 Remedial Casing Cementing 169.00 172.00 0
2013-06-13 Packing Device Capped w/Cement 155.00 164.00 0
1967-10-04 Perforation 350.50 350.50 16
1967-10-04 Perforation 277.40 277.40 16
1967-10-04 Perforation 320.00 320.00 16
1967-10-05 Acid Treatment 350.50 350.50 0
1967-10-05 Cement Squeeze 350.50 350.50 0
1967-10-06 Acid Wash 320.00 320.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 2082 0.0 0.0 0.0
1970 8296 0.0 0.0 0.0
1971 8482 0.0 0.0 0.0
1972 8458 0.0 0.0 0.0
1973 8540 0.0 0.0 0.0
1974 8665 0.0 0.0 0.0
1975 8627 0.0 0.0 0.0
1976 8568 0.0 0.0 0.0
1977 7900 0.0 0.0 0.0
1978 8505 0.0 0.0 0.0
1979 8166 0.0 0.0 0.0
1980 5694 0.0 0.0 0.0
1981 7679 0.0 0.0 0.0
1982 7001 0.0 0.0 0.0
1983 5095 0.0 0.0 0.0
1984 4557 0.0 0.0 0.0
1985 5101 0.0 0.0 0.0
1986 5160 0.0 0.0 0.0
1987 6950 0.0 0.0 0.0
1988 6419 0.0 0.0 0.0
1989 1017 0.0 0.0 0.0
1991 4 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1962-11-25 Lost Circulation 486.80 486.80
2013-06-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References