X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0654150111000

Well Details

Well ID: 0654150111000
Loading map...
Location: 00/11-01-065-15W4/0
Location Alias: 00/11-01-65-15 W4M
Location Alias 2: 00/11-01-065-15 W4/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 4
Range: 15
Section: 01
County/Municipality: Lac La Biche County
Well Name: SOC BONDISS 11-1-65-15
Operator Name: AlphaBow Energy Ltd.
License Number: 0070533
License Date: 1978-07-06
License Status: Abandoned
Spud Date: 1978-07-08
Final Drill Date: 1978-07-10
Well Total Depth: 540.00 m
Surface Hole Latitude: 54.596616
Surface Hole Longitude: -112.137357

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-07-06 Obtained License
1978-07-10 Finished Drilling
1978-07-10 Lost Circulation Occurred
1978-07-12 Production Casing Operation Performed
1978-07-12 Well Mode changed to Drilled and Cased
1978-10-19 Perforation Treatment Performed - Jet Perforation
1982-10-26 Well Began Production
1982-10-26 Well Fluid changed to Gas
1982-10-26 Well Mode changed to Flowing
1983-03-31 Well Fluid changed to Gas
1983-03-31 Well Mode changed to Suspended
1984-10-01 Well Fluid changed to Gas
1984-10-01 Well Mode changed to Flowing
1993-03-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-03-31 Plug Back Performed
1993-03-31 Well Abandoned
1993-03-31 Well Fluid changed to Gas
1993-03-31 Well Mode changed to Abandoned
2012-01-14 Well Log Performed
2012-01-17 Perforation Treatment Performed - Jet Perforation
2012-01-17 Well Log Performed
2012-01-27 Perforation Treatment Performed - Remedial Casing
2012-01-28 Well Log Performed
2012-02-09 Perforation Treatment Performed - Jet Perforation
2012-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-02-14 Perforation Treatment Performed - Remedial Casing
2012-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-22 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-19 Perforation 487.00 491.00 13
1993-03-31 Packing Device Capped w/Cement 474.00 482.00 0
2012-01-17 Perforation 322.50 325.50 20
2012-01-27 Remedial Casing Cementing 322.50 325.50 0
2012-02-09 Perforation 189.00 193.00 20
2012-02-11 Acid Treatment 189.00 193.00 0
2012-02-14 Remedial Casing Cementing 189.00 193.00 0
2012-02-22 Packing Device Capped w/Cement 177.00 185.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1632 0.0 0.0 0.0
1983 1126 0.0 0.0 0.0
1984 13 0.0 0.0 0.0
1985 120 0.0 0.0 0.0
1988 5402 0.0 0.0 0.0
1989 4351 0.0 0.0 0.0
1990 4991 0.0 0.0 0.0
1991 5221 0.0 0.0 0.0
1992 5234 0.0 0.0 0.0
1993 1079 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-07-10 Lost Circulation 540.00 540.00

For data sources see[6]

References