X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0654152701002

Well Details

Well ID: 0654152701002
Loading map...
Location: 00/01-27-065-15W4/2
Location Alias: 00/01-27-65-15 W4M
Location Alias 2: 00/01-27-065-15 W4/02
Country: Canada
Province: Alberta
Township: 065
Meridian: 4
Range: 15
Section: 27
County/Municipality: Lac La Biche County
Well Name: SOC HYLO 1-27-65-15
Operator Name: AlphaBow Energy Ltd.
License Number: 0064520
License Date: 1977-06-28
License Status: Abandoned
Spud Date: 1977-07-04
Final Drill Date: 1977-07-06
Well Total Depth: 518.20 m
Surface Hole Latitude: 54.646804
Surface Hole Longitude: -112.175188

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-06-28 Obtained License
1977-07-06 Finished Drilling
1977-07-06 Lost Circulation Occurred
1977-07-06 Well Mode changed to Drilled and Cased
1977-07-09 Drill Stem Test Performed
1977-07-10 Drill Stem Test Performed
1977-07-11 Drill Stem Test Performed
1977-07-12 Production Casing Operation Performed
1977-08-10 Perforation Treatment Performed - Cement Squeeze
1977-08-10 Perforation Treatment Performed - Jet Perforation
1977-08-12 Perforation Treatment Performed - Jet Perforation
1977-08-13 Perforation Treatment Performed - Cement Squeeze
1977-08-13 Perforation Treatment Performed - Jet Perforation
1977-08-15 Perforation Treatment Performed - Acid Wash - No Pressure
1977-08-15 Perforation Treatment Performed - Jet Perforation
1977-08-16 Perforation Treatment Performed - Jet Perforation
1993-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-01-31 Perforation Treatment Performed - Jet Perforation
1993-01-31 Plug Back Performed
1993-02-14 Well Began Production
1993-02-14 Well Fluid changed to Gas
1993-02-14 Well Mode changed to Flowing
1995-10-31 Well Fluid changed to Gas
1995-10-31 Well Mode changed to Suspended
1998-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-27 Plug Back Performed
1998-11-27 Well Fluid changed to Gas
1998-11-27 Well Log Performed
1998-11-27 Well Mode changed to Abandoned Zone
1999-07-27 Well Abandoned
1999-07-27 Well Fluid changed to Gas
1999-07-27 Well Mode changed to Abandoned
2011-01-05 Well Log Performed
2011-10-30 Perforation Treatment Performed - Cement Squeeze
2011-10-30 Perforation Treatment Performed - Jet Perforation
2011-10-30 Plug Back Performed
2011-10-31 Perforation Treatment Performed - Jet Perforation
2011-11-28 Well Log Performed
2011-12-04 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2011-12-04 Plug Back Performed
2011-12-10 Perforation Treatment Performed - Remedial Casing
2011-12-11 Well Log Performed
2011-12-13 Perforation Treatment Performed - Jet Perforation
2011-12-13 Well Log Performed
2011-12-15 Perforation Treatment Performed - Jet Perforation
2011-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-18 Perforation Treatment Performed - Remedial Casing
2011-12-18 Plug Back Performed
2011-12-19 Perforation Treatment Performed - Remedial Casing
2012-01-07 Perforation Treatment Performed - Jet Perforation
2012-01-09 Perforation Treatment Performed - Remedial Casing
2012-01-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-08-10 Perforation 469.40 470.90 3
1993-01-31 Packing Device Capped w/Cement 449.00 457.00 0
1993-01-31 Packing Device Capped w/Cement 440.00 448.00 0
1993-01-31 Perforation 422.50 424.30 13
1998-11-27 Packing Device Capped w/Cement 410.00 418.00 0
2011-10-30 Perforation 422.50 424.30 13
2011-10-30 Cement Squeeze 422.50 424.30 0
2011-10-31 Perforation 453.50 455.40 7
2011-12-04 Packing Dev Cpd w/Res-Gyp Cem 464.80 467.80 0
2011-12-10 Remedial Casing Cementing 453.50 455.40 0
2011-12-13 Perforation 357.00 359.00 17
1977-08-10 Cement Squeeze 469.40 470.90 0
2011-12-15 Perforation 388.00 390.00 20
2011-12-18 Remedial Casing Cementing 388.00 390.00 0
2011-12-18 Packing Device Capped w/Cement 377.00 385.00 0
2011-12-19 Remedial Casing Cementing 357.00 359.00 0
2012-01-07 Perforation 190.00 193.00 20
2012-01-09 Remedial Casing Cementing 190.00 193.00 0
1977-08-12 Perforation 499.90 501.40 3
1977-08-13 Perforation 492.30 493.80 3
1977-08-13 Perforation 457.20 458.40 3
1977-08-13 Cement Squeeze 457.20 501.40 0
1977-08-15 Perforation 457.20 460.20 7
1977-08-15 Acid Wash 457.20 460.20 0
1977-08-16 Perforation 453.50 455.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 7650 0.0 0.0 0.0
1994 7874 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-07-06 Lost Circulation 518.20 518.20

For data sources see[6]

References