If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0655061003000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.606664,"lon":-114.825046,"icon":""}]} |
| Location: 00/03-10-065-06W5/0 | |
| Location Alias: 00/03-10-65-06 W5M | |
| Location Alias 2: 00/03-10-065-06 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 065 | |
| Meridian: 5 | |
| Range: 06 | |
| Section: 10 | |
| County/Municipality: Woodlands County | |
| Well Name: NEW CACHE HARTWELL FOLEYLK 3-10-65-6 | |
| Operator Name: Bellatrix Exploration Ltd. | |
| License Number: 0185852 | |
| License Date: 1996-02-15 | |
| License Status: Suspension | |
| Spud Date: 1996-03-10 | |
| Final Drill Date: 1996-03-15 | |
| Well Total Depth: 1244.00 m | |
| Surface Hole Latitude: 54.606664 | |
| Surface Hole Longitude: -114.825046 |
| Date | Event |
|---|---|
| 1996-02-15 | Obtained License |
| 1996-03-11 | Surface Casing Operation Performed |
| 1996-03-15 | Finished Drilling |
| 1996-03-16 | Production Casing Operation Performed |
| 1996-03-16 | Well Log Performed |
| 1996-03-17 | Rig Released |
| 1996-03-17 | Well Mode changed to Drilled and Cased |
| 1996-03-29 | Perforation Treatment Performed - Jet Perforation |
| 1996-03-29 | Well Log Performed |
| 1996-03-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-03-30 | Well Log Performed |
| 1996-03-31 | Perforation Treatment Performed - Jet Perforation |
| 1996-03-31 | Well Log Performed |
| 2006-01-21 | Well Began Production |
| 2006-01-21 | Well Fluid changed to Gas |
| 2006-01-21 | Well Mode changed to Flowing |
| 2006-02-25 | Perforation Treatment Performed - Jet Perforation |
| 2006-02-25 | Well Log Performed |
| 2009-09-01 | Well Fluid changed to Gas |
| 2009-09-01 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1996-03-29 | Perforation | 1191.00 | 1195.00 | 13 |
| 1996-03-30 | Packing Device Capped w/Cement | 1172.00 | 1180.00 | 0 |
| 1996-03-31 | Perforation | 1134.50 | 1135.50 | 14 |
| 2006-02-25 | Perforation | 1140.50 | 1143.00 | 20 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2006 | 4664 | 0.0 | 0.0 | 0.0 |
| 2007 | 309 | 0.0 | 0.0 | 0.0 |
For data sources see[5]